Exam (elaborations)
CSE 2221 FINAL EXAM-2024 QUESTIONS AND ANSWERS PASSED AND VERIFIED.
- Course
- Institution
In design-by-contract, when is precondition (requires clause) of a method is not satisfied the implementer of a method is obligated to: - ANSWER A. stop the program and report an error B. generate a default result that will let the client know of their error C. make sure the postcondition (en...
[Show more]