Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024 ACTUAL EXAM COMPLETE 500 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+ $33.48   Ajouter au panier

Examen

DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024 ACTUAL EXAM COMPLETE 500 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

 7 vues  0 fois vendu
  • Cours
  • Établissement

DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024 ACTUAL EXAM COMPLETE 500 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+ DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024 ACTUAL EXAM COMPLETE 500 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Aperçu 4 sur 104  pages

  • 4 juin 2024
  • 104
  • 2023/2024
  • Examen
  • Questions et réponses
avatar-seller
DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024
ACTUAL EXAM COMPLETE 500 QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED ANSWERS)
|ALREADY GRADED A+

DBIA EXAM I


In which project delivery method is the construction team brought on
AFTER design, with open bidding? - ANSWER---- DBB


In the planning phase, Influence has a _____ impact on the project. -
ANSWER---high


In which project delivery method is the construction team brought on
EARLY, facilitating fast-tracking? - ANSWER---DB


Spearin Doctrine: Owner hiring designers provides contractors two
specific implied warranties: Plans and specs are _____; Plans and specs
are suitable for _____ _____. - ANSWER---- accurate
- intended purpose


What are the 5 types of project delivery systems? - ANSWER---- DB
- DBB
- CMAR
- IPD
- Multiple prime contracting

, DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024
ACTUAL EXAM COMPLETE 500 QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED ANSWERS)
|ALREADY GRADED A+


_____ is a linear sequential process. - ANSWER---DBB


In DBB, the A/E is typically selected on _____ and the GC is typically
selected on _____ _____. - ANSWER---- qualifications
- low price


In DBB, design is fully completed _____ input from the GC. -
ANSWER---without


In _____, the A/E is acting in the owner's interests. - ANSWER---DBB


Who controls the design team selection in DBB? - ANSWER---The
Owner


The _____ project delivery method is well established and understood. -
ANSWER---DBB


Which project delivery system is consistent with public sector
procurement laws and the most prevalent delivery system through the
20th century? - ANSWER---DBB

, DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024
ACTUAL EXAM COMPLETE 500 QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED ANSWERS)
|ALREADY GRADED A+

In DBB the _____ _____ is incompatible with expediting project
delivery. - ANSWER---Linear sequence


in _____, the contractor's input is absent during the design process. -
ANSWER---DBB


In DBB, the Owner has a "_____ of _____ relationship" with the A/E. -
ANSWER---Standard of Care Relationship


In DBB, the Owner has a "_____ relationship" with the Contractor. -
ANSWER---Spearing Relationship


What 2 methods of selection (procurement methods) does CMAR use? -
ANSWER---- QBS
- Best Value


Who provides the pre-construction services for CMAR? - ANSWER---
Contractor


What kind of contracting approach is usually used in CMAR? -
ANSWER---Negotiated GMP

, DBIA EXAM 1, EXAM 2 AND EXAM 3 NEWEST 2024
ACTUAL EXAM COMPLETE 500 QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED ANSWERS)
|ALREADY GRADED A+

What is special about the estimating process in CMAR? - ANSWER---it
is an open-book


Which delivery methods have the chance to fast track the schedule? -
ANSWER---- DB
- CMAR


In CMAR, the construction cost is determined _____ the design is
completed. - ANSWER---before


In CMAR, the Owner procures and manages designers and contractors
under (one / two separate) contracts? - ANSWER---two separate


In CMAR, the _____ negotiates the full commercial deal. - ANSWER---
Owner


In CMAR, what is the direct contractual relationship between the
contractor and designer? - ANSWER---There is no direct contractual
relationship


In CMAR, there is _____ public sector authority for its use. -
ANSWER---limited

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur erickarimi. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour $33.48. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

67096 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!

Récemment vu par vous


$33.48
  • (0)
  Ajouter