100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Oil burner test Exam/58 Questions and answers $8.49   Add to cart

Exam (elaborations)

Oil burner test Exam/58 Questions and answers

 1 view  0 purchase
  • Course
  • Institution

Oil burner test Exam/58 Questions and answers

Preview 2 out of 5  pages

  • June 5, 2024
  • 5
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
Oil burner test Exam/58 Questions
and answers
Max safety timing on a primary control - -15 seconds

-Safety control circuits shall be - -2-wire, one side grounded, with nominal
voltage not exceeding 150v

-Crankcase/used oil may only be used in - -Commercial/industrial setting. Or
in a appliance specifically designed to do so.

-Oil burning appliance shall be how far from electrical panel and oil tank - -3
feet from panel, 5 feet from tank

-Flue gas exit of a chimney shall be Atleast - -3 feet above highest point of
the building, 2 feet above any portion of a building within 10 feet

-Prior to installation of new equipment, installer must - -Perform visual
inspection of the chimney or flue gas venting system

-Masonry chimneys shall be - -Lined with an approved clay tile liner or a
listed chimney lining system

-Natural draft chimney connector shall not exceed __ unless a draft fan is
used - -10 feet

-A chimney connector shall not pass through a - -Floor or cieling

-Chimney connector of low, medium, or high heat Industrial appliance shall
not pass through a - -Combustible wall of partisan

-Chimney connector need a pitch of - -1/4

-A venting system that terminates in the sidewall shall be - -3 feet above
any air inlet that is within 10 feet of the vent.

-Can I use any forms other than Form 1 or Form 1A? - -No, only Form 1 and
form 1A as approved by the State Fire Marshal shall be used by local fire
departments and installers. No modification whatsoever of the form are
allowed.

-What must I do if I have a tank larger than 10,000 gallons? - -You must
apply for, and obtain both a permit and a license from the local town or city
for the use of the tank and the storage of the fuel oil.

, -What licenses are acceptable for installing an oil burner and or an oil tank?
- -Holder of certificate of competency

-Can anyone make out Form 1 or Form 1A? - -Yes, but only a holder of a
Certificate of Competency can sign as the installer on a Form 1 and as the
inspector in the case of a Form 1A.

-Do I need to pull a permit when replacing an oil line or installing an osv? - -
Yes. Any alteration of an oil burner installation requires a permit be pull
under CMR 1.00 using a Form 1 only.

-Can I cross connect two tanks (at the bottom) to the same burner with 3/8
inch pipe or tubing? - -No, the cross connection of two supply tanks to the
same burner must be made with pipe no smaller than 1/2 inch iron pipe or
1/2 o.d. tubing.

-On a new installation, can I install an oil safety valve or osv in the oil line
instead of encasing the line in a continuous sleeve? - -No, on new
installations where the oil supply line is in direct contact with concrete or
earth, the supply line must be installed in a continuous sleeve.

-Is any non-metallic material acceptable for use as an oil line sleeve? Would
rubber or pvc hose be acceptable? - -Yes.

-When can I use an osv or oil safety valve? - -On existing installations when
a burner, boiler, furnace, or tank is replaced, an osv may be installed at the
tank end of the oil supply line instead of replacing the line as in a new
installation.

-Can I use either the button type or wheel type thermal (Firomatic) switch? -
-Yes, any thermal switch may be used as long as the manufacturer has
secured a listing from an approved testing lab, and that the switch complies
with both CMR 1.00, and the Massachusetts Electrical Code,

-Can I use a stack switch? - -Only to replace an existing control of the same
type already in use and existing.

-Can a technician replace an existing primary control with a safety timing of
more than 15 seconds during a routine service call? - -Yes, but only to
replace an existing control of the same type already is use and existing. Any
new primary control being installed must have a safety timing of no longer
than 15 seconds and be equipped to provide for interrupted ignition.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Victorious23. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $8.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81849 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling

Recently viewed by you


$8.49
  • (0)
  Add to cart