2400 Final Exam
In which of the project delivery phases is the team currently engaged? - ANS-E.
Predesign
Letter X - ANS-C. Owner
Letter Z - ANS-C. Structural and civil consultants
Letter C - ANS-A. Subcontractor
Letter E - ANS-D. Owner
During the construction phase, the architect - ANS-C. Observes construction on a
regular basis
Which of the following is not one of the required items of a set of construction drawings?
- ANS-C. Digital "walk-throughs"
The CSI MasterFormat is a standardized organizational system for specifications based
on a numbering systems. An example of a specification number is: 06 10 00. The
number 06 in the example provided above refers to a specifications group called -
ANS-D. A Division
Letter A - ANS-A. Architect
Which of the following aspects of design and construction is not regulated by the
building code? - ANS-C. Aesthetic qualities
Construction of a new building can begin only after - ANS-A. An application for a new
building permit has been approved and received by the owner
Dimensions of stair treads and risers - ANS-A. Life Safety
The size and properties of a steel column - ANS-B. Structural Safety
The IBC has been adopted for use - ANS-B. By many of the states in the United States
, The occupancy type is one of the most important considerations when determining the
level of hazard present in a building. Which of the following is not an occupancy-related
hazard? - ANS-B. The number of kitchens provided in the building
In Lab, laser levels/optical levels can be used to set interior/exterior elevations - ANS-A.
True
To which of the following categories do the construction standards not apply? - ANS-B.
Types of building occupancies
The ADA is a comprehensive legislative act passed in 1992. It addresses - ANS-E. All
the Above
ANSI is the most important standards producing agency in the US - ANS-A. True
The dimensions of stair treads and risers are regulated by the building code - ANS-A.
True
The authority granted to the building official to enforce the building code comes from the
police powers of the state - ANS-A. True
Which of the following is not part of a floor live load? - ANS-D. Floor Slab
Loads that are most significant in highrise buildings are - ANS-D. Wind Loads
Which of the following does not cause lateral loads on buildings? - ANS-D. Snow
In Lab, the height of the instrument (H.I.) is obtained by adding the Foresight (F.S.) to
the Benchmark (B.M.) - ANS-B. False
Wood light frame construction originated in - ANS-C. Chicago
The construction type illustrated in this diagram is an example of - ANS-B. Platform
frame
The minimum required thickness of floor sheathing is generally a function of - ANS-D.
A&B
The minimum slope for a rafter and ceiling joist assembly is generally - ANS-D. 3:12
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller denicetho. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $9.35. You're not tied to anything after your purchase.