100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
LEED GA Exam (3). $9.24   Add to cart

Exam (elaborations)

LEED GA Exam (3).

 0 view  0 purchase
  • Course
  • Institution

Exam of 3 pages for the course 126 MTTC English as a Second Language at 126 MTTC English as a Second Language (LEED GA Exam (3).)

Preview 1 out of 3  pages

  • June 5, 2024
  • 3
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
LEED GA Exam
If a school is to be constructed, what is the minimum project size requirement for it to be
LEED certified? - ANS-1,000 square feet*

What is the intent of the integrative process credit? - ANS-To encourage teamwork and
cooperation among the project team pursing LEED

The __________ is the projected water use of a building assuming it has met
code-compliant fixtures and fittings. This however does not include the projection for
additional savings comparison with the actual meter data. - ANS-Baseline water
consumption*

When constructing bicycle networks, what is the minimum distance or width allowed for
a two-way bicycle path or trail? - ANS-8 ft

This term is used for the materials used in flooring, casework, wall coverings which
could be permanent or semi-permanent. - ANS-Base building

What is the maximum space allowed between two points when conducting
ASE1000,250 reporting? - ANS-2 ft ("ASE1000,250 reports the percentage of sensors
in the analysis area, using a maximum 2-foot spacing between points, that are found to
be exposed to more than 1000 lux of direct sunlight for more than 250 hours per year,
before any operable blinds or shades are deployed to block sunlight, considering the
same 10 hour/day analysis period as sDA and using comparable simulation methods"
via USGBC)

This results in the absorption of heat by man-made features like non-reflective
pavement and buildings - ANS-Heat Island Effect

Which of the following is NOT a task of the LEED Project Administrator? - ANS-A PA
can decide which projects are to be submitted for GBCI review

This term is used to refer to the extraction of usable heat, energy, and electricity from
nonrecyclable waste materials - ANS-Waste-to-Energy

What document is issued upon construction completion that a building has been built in
accordance with local building and construction codes? - ANS-Certificate of Occupancy

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller denicetho. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.24. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67474 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.24
  • (0)
  Add to cart