ACI Certification- Concrete Field-Testing Technician
Grade 1 CP-1 (12) 100% Correct Answers | Verified |
Latest 2024 Version
The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into
the freshly mixed concrete. - 3"
The temperature measuring device shall...
The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into
the freshly mixed concrete. - ✔✔3"
The temperature measuring device shall have a capacity of measuring temperature of freshly mixed
concrete to ± ______ °F throughout a range of ____________. - ✔✔1 degree, 30 degrees to 120 degrees
The temperature measuring device shall be calibrated ______ , or whenever there is a question of
______ . - ✔✔Annually, accuracy
The temperature of concrete may be measured in a wheelbarrow. True or False? - ✔✔True
The temperature of concrete may be measured in a wall form. True or False? - ✔✔True
What must be done to the sample container prior to sampling the concrete? - ✔✔Dampen with water
What must be done to the concrete surrounding the temperature measuring device after the device is
submerged in the fresh concrete? - ✔✔Close off air voids by gently pressing the concrete around the
device
How long must the temperature measuring device remain in the freshly mixed concrete? - ✔✔minimum
of two minutes, maximum of five minutes
The temperature of the concrete is reported to the nearest ______ °F - ✔✔1 degree
A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True or False? - ✔✔False
,ASTM C172 - ✔✔Standard Practice for Sampling Freshly Mixed Concrete
Sampling by this method is required when tests are to be made to determine _____ with specification
requirements. - ✔✔Compliance
This method covers sampling from four types of mixers, which are _____ , _____ , _____ , and _____ . -
✔✔Stationary mixers, paving mixers, revolving drum mixers and open top mixers
The maximum allowable time between obtaining the first and final portions of a composite sample is
_____ minutes. - ✔✔15
Portions of a composite sample shall be thoroughly remixed before beginning tests on the sample. True
or False? - ✔✔True
The maximum elapsed time allowed between obtaining the final portion of the composite sample and
beginning the tests for slump, temperature, and air content is _____ minutes. - ✔✔5
The molding of strength test specimens shall begin within _____ minutes after fabricating the composite
sample. - ✔✔15
The concrete sample must be protected from contamination and _____. - ✔✔Rapid evaporation
The minimum size sample for making strength test specimens is _____. - ✔✔1 cubic foot
When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced
intervals during discharge of the middle portion of the batch. - ✔✔2
The composite sample for a paving mixer must represent a minimum of _____ different portions of the
batch of concrete taken from the pile after discharge. - ✔✔5
, When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____
regularly spaced intervals during discharge of the middle portion of the batch. - ✔✔2
Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the
mixer at the job site. True or False? - ✔✔False
The composite sample from a truck mixer must be obtained from the _____ portion of the batch. -
✔✔middle
When the concrete contains aggregate larger than that permitted for a particular test method, the
sample of concrete must be _____ _____ before making the test. - ✔✔wet sieved
What must occur before a sample of concrete can be taken from a revolving drum mixer? (Oral Exam) -
✔✔All of the water must be added to the mixer
Describe the different procedures that can be used to collect a sample of concrete from a stationary or
revolving drum mixer. (Oral Exam) - ✔✔Repeatedly pass a receptacle through the entire discharge
stream, Completely divert the discharge stream into a sample container
What are the required steps for collecting a sample of concrete from a stationary or revolving drum
mixer? (Oral Exam) - ✔✔Collect two or more portions of concrete, Take the portions at regularly spaced
intervals, Take the portions from the middle of the batch
Describe the procedure for collecting a sample of pavement concrete deposited on grade. (Oral Exam) -
✔✔Discharge the contents of the paving mixer, Obtain samples from at least five different portions of
the pile
What is the minimum size for a sample when strength test specimens are to be molded? (Oral Exam) -
✔✔1 cubic foot (28 L)
What is the maximum allowable time between obtaining the first and final portions of the composite
sample? (Oral Exam) - ✔✔15 min.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller hov. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $8.99. You're not tied to anything after your purchase.