The Construction Manager is hired by this entity? The Gen. Contractor In a DBB project method, the gen. Construction contract is between: the contractor and the owner When there is a dispute between the specs and the drawings, what is the proper way to settle the dispute The A/E should intrepret CSI Masterformat Div 1 sections apply broadly to the execution of the work of all the other sections of the specs True A subcontractor is obligated to the prime contractor in the same manner as the prime contractor is obligated the owner What is the relationship between A/E and contract in a dbb project delivery method? There is no contractual relationship In a DB project method, the owner develops a program and has one contract with a single entity to design and construct the projectTrue Inspections required by authorities having jurisdiction shall be obtained by the: Contractor Which project delivery method defines the con. Manager as an independent advisor to the owner Construction management Who is required to protect stored materials? the contractor A particular material may be indicated several times on the drawings but is specified in how many locations: There is only "One" location Who is required to have a program for project site safety? the contractor Reinforcing steel is placed in typical
Escuela, estudio y materia
- Institución
- CET 120
- Grado
- CET 120
Información del documento
- Subido en
- 8 de junio de 2024
- Número de páginas
- 16
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
cet 120 questions and answers 100 solved