CEPSCI PRACTICE TEST
1972 clean water act - CORRECT ANSWER-Administered by the US
environmental protection agency (EPA) Created the NPDES

1987 - CORRECT ANSWER-Amendment to CWA CALLED WATER QUALITY
ACT

NPDES in south carolina - CORRECT ANSWER-South Carolina is NPDES
delegated state.

NPDES regulations are administered by - CORRECT ANSWER-SCDHEC

CGP authorizes - CORRECT ANSWER-stormwater discharges from construction
sites

Who must obtain NPDES coverage - CORRECT ANSWER-land disturbing
activities greater than or equal to 1 acre
-land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone

NPDES permits are issued to - CORRECT ANSWER-operator-person or
company for a particular discharge

primary permittee - CORRECT ANSWER--has day to day operational control to
ensure compliance with SWPP
-typically the owner or developer

primary permittee responsibilites - CORRECT ANSWER-submit NOI, Preparation
of the C_SWPPP

Secondary permittee - CORRECT ANSWER-individual lot owner or residential
builder that conducts land disturbing activity limited to an individual lot or group of
lots as part of approved LCP of development

contractors - CORRECT ANSWER-must on Contractor Certification- D-0437

, On-Site SWPPP - CORRECT ANSWER-SCDHEC CGP, NOI, NPDES coverage
approval letter, Contractor Certifications, Local Approvals, USACE approvals,
Critical area permit(coast)

OS_SWPPP - CORRECT ANSWER-a copy of signed and certified SWPPP, NOI,
and CGP coverage letter from DHEC must be retained at site or electronically
accessible

minor modification to ON-SWPPP - CORRECT ANSWER-minor modifications
made directly in the field,do not need approval by DHEC- additional BMP's,
removal of disturbed areas

major modifications to OS-SWPPP - CORRECT ANSWER-must be made by
qualified individual and submitted to DHEC or appropriate delegated entity for
approval

Phased plan requirement > 5 - CORRECT ANSWER-include a phased
stormwater management plan which identifies all BMP's and grading work
conducted during a specific portion of the sites construction sequence. Each
phase identified on at least one separate plan sheet.

Phased plan requirement < 10 but > 5 acres - CORRECT ANSWER-at least two
separate plan phases are required - initial land disturbance phase - stabilization
phase

Phased plan requirement ≥ 10 acres - CORRECT ANSWER-at least 3 separate
plan phases are required - initial land disturbance phase - construction phase -
stabilization phase

All compliance inspection must include invesg. of, at a minimum of 5 of the
following - CORRECT ANSWER-1. areas of site disturbed by construction
activity and areas used for storage of materials exposed to precipitation
2. stormwater conveyance systems for evidence of sediment
3. BMP's identified in OS-SWPPP
4. Discharge location to investigate if sediment leaving site, or if such locations
are inaccessible, nearby downstream location if possible.
5. Where vehicles enter or exit site for evidence of off-site sediment tracking.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller modockochieng06. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79650 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart