Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Class notes

Estimation & quantity surveying, A quantity surveyor works on a construction project from the very start. First, you’ll liaise with the client and their contractors during the contract process by engaging in preliminary cost analysis. Once work begins, yo

Rating
-
Sold
-
Pages
115
Uploaded on
19-06-2024
Written in
2019/2020

I have uploaded a detailed study of estimation and quantity surveying; all of them are useful for my notes to learn about this more deeply.

Institution
Course

Content preview

A Course Material on

Estimation, Costing and Valuation




By

Dr. N Seshadri sekhar

Associate Professor

DEPARTMENT OF CIVIL & STRUCTURAL ENGINEERING
Scsvmv, Kanchipuram




This is to certify that the e-course material

Subject Code :

Subject : Estimation, Costing and Valuation
Class : IV Year CIVIL, CIVIL&STRUCTURAL ENGINEERING




being prepared by me and it meets the knowledge requirement of the university curriculum.




Signature of the Author




1

, ESTIMATION AND QUANTITY SURVEYING LTPC
3104

OBJECTIVE
This subject covers the various aspects of estimating of quantities of items of works involved
in buildings, water supply and sanitary works, road works and irrigation works. This also
covers the rate analysis, valuation of properties and preparation of reports for estimation of
various items. At the end of this course the student shall be able to estimate the material
quantities, prepare a bill of quantities, make specifications and prepare tender documents.
Student should also be able to prepare value estimates.

UNIT I ESTIMATE OF BUILDINGS 11 Hrs
Introduction to estimation- Necessity of Estimation- Units and Measurents-Types of
Estimates- Methods of Estimation-Load bearing and framed structures
Calculation of quantities of brick work, RCC, PCC, Plastering, white washing, colour washing
and painting / varnishing for shops, rooms, residential building with flat and pitched roof –
Various types of arches – Calculation of brick work and RCC works in arches – Estimate of
joineries for panelled and glazed doors, windows, ventilators, handrails etc.- Estimation of
Steel for RCC works.

UNIT II ESTIMATE OF OTHER STRUCTURES 10 Hrs
Estimating of septic tank, soak pit – sanitary and water supply installations – water supply
pipe line – sewer line – tube well – open well
Estimate of bituminous and cement concrete roads – estimate of retaining walls – culverts –
estimating of irrigation works – aqueduct, syphon, fall.

UNIT III SPECIFICATION AND TENDERS 8Hrs
Data – Schedule of rates – Analysis of rates – Specifications – sources – Detailed and
general specifications for buidings, Roads
Tenders – Contracts – Types of contracts, BOT – Arbitration and legal requirements.

UNIT IV VALUATION 8 Hrs
Necessity – Basics of value engineering – Capitalised value – Depreciation – Escalation –
Calculation of Standard rent – Mortgage – Lease-Valuation of Building- Loss assessment

UNIT V REPORT PREPARATION 8 Hrs
Principles for report preparation – report on estimate of Official building – Culvert – Roads –
Water supply and sanitary installations – Tube wells – Open wells.

TEXT BOOKS TOTAL: 45 PERIODS

Dutta, B.N., “Estimating and Costing in Civil Engineering”, UBS Publishers & Distributors Pvt.
Ltd., 2003
Kohli, D.D and Kohli, R.C., “A Text Book of Estimating and Costing (Civil)”, S.Chand &
Company Ltd., 2004

REFERENCES
PWD Data Book
CPWD Schedule of rates
TN schedule of rates



1

, Table of Contents
S.No Title Page No
1 ESTIMATE OF BUILDINGS 1
1.1 General 1
1.2 Units Of Measurements 1
1.2.1 Rules For Measurement 1
1.3 Requirements Of Estimation And Costing 2
1.3.1 Procedure Of Estimating Or Method Of Estimating 2
1.3.2 Data Required To Prepare An Estimate 2
1.3.3 Drawings 3
Specifications 3
Rates 3
1.3.6 Lumpsum 3
1.3.7 Work Charged Establishment 3
1.4 Methods Of Taking Out Quantities 4
1.4.1 Long Wall-Short Wall Method 4
1.4.2 Centre Line Method 4
1.4.3 Partly Centre Line And Partly Cross Wall Method 4
1.4.4 Detailed Estimate 6
Factors To Be Considered While Preparing Detailed Estimate 6
Data
6
1.4.7 Fixing Of Rate Per Unit Of An Item 7
1.4.8 Methods Of Preparation Of Approximate Estimate 7
1.4.9 Plinth Area Method 7
1.4.10 Cubical Contents Method 8
2 ESTIMATE OF OTHER STRUCTURES 14
2.1 Estimating of septic tank with soak pit 14
2.2 Estimate of bituminous and cement concrete roads 16
2.3 Estimate of retaining walls 19
2.4 Estimate of culverts 19
2.5 Estimating of irrigation works 20
2.6 Estimate of aqueduct, syphon, fall 21
3 SPECIFICATION AND TENDERS 23
3.1 General Or Brief Specification 23
3.2 Detailed Specifications 23
Detailed Specifications Of Excavations, Filling And Back 23
Filling
antitermite Treatment 30
3.2.3 Hard Core / Soling Under Floors / Foundation 34
3.2.4 Reinforced Concrete And Allied Works 35



1

, Form Work 42
Steel Reinforcement 43
Structural Steel 46
Damp Proof Course 48
Brick Work 49
Schedule Of Rates 51
Procedure Of Rate Analysis 51
Requirement Of Labour And Materials 52
VALUATION 54
Objects Of Valuation 54
Six Important Purposes Of Valuation 54
Definitions 55
Market Value 55
Book Value 55
Capital Cost 55
Sinking Fund Method 56
Direct Comparison With The Capital Value 56
Depreciation Method Of Valuation 57
Methods For Calculating Depreciation 57
Fixation Of Rent 58
Calculation Of Standard Rend Of A Govt. Property 58
REPORT PREPARATION 60
Report On Estimates for the Construction of Residential Building 60
Report on Estimate for Construction of a Culvert 61
Report on the Estimate for a Road Construction 62
Principle for the preparation of Water supply Scheme 63
The project or scheme of major work consist of the following 64
works




1

Written for

Institution
Course

Document information

Uploaded on
June 19, 2024
Number of pages
115
Written in
2019/2020
Type
Class notes
Professor(s)
Dr. n seshadri sekhar
Contains
All classes

Subjects

$9.29
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
vishnusaji2255

Get to know the seller

Seller avatar
vishnusaji2255 Sri Chandrasekharendra Saraswathi Viswa Mahavidyalaya Deemed university at Kancheepuram in Tamil Nadu, India
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
1 year
Number of followers
0
Documents
1
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions