100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

MCPPO Design and Construction Questions & Answers

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
21-06-2024
Written in
2023/2024

MCPPO Design and Construction What are the three stages of the design and construction process for public construction projects in MA - Answer- Planning, Design, and Construction What does the design stage result in? - Answer- A complete set of plans and specifications describing the project to be built. What happens after a set of plans and specifications is complete? - Answer- Bids are solicited on the completed design, and the selected contractor completes the construction stage. Who is always responsible and accountable for the project? - Answer- Public Owner (Awarding Authority) Before contracting for design services in connection with a public building contract estimated to cost $1.5 million or more, your jurisdiction is required to do what? - Answer- Contract with or assign an Owner's Project Manager (OPM) Serves as your jurisdiction's agent during the planning, design, and implementation of the construction work. - Answer- OPM Independent of the project designer, general contractor, or any subcontractor. - Answer- OPM I you elect to contract for the services of an OPM, what are you required to do? - Answer- Use a qualifications-based selection process, which means that the OPM must be competitively selected on the basis of qualifications, without price competition. Can you assign an employee to serve as OPM? - Answer- Yes, if the employee meets or exceeds the requirements and has building construction and supervision experience relating to projects of similar size and scope of complexity. What is a study? - Answer- A pre-design document that: -Confirms and explains the owner's requirements -Identifies and evaluates alternative solutions -Recommends and defines a solution Purpose is to identify the owner's needs and determine the most appropriate and cost effective solution to meeting the needs. - Answer- Study True or False: A study may not result in a construction project. - Answer- True More refined and detailed than the conceptual drawings that were included in the study. Includes floor plans, side views, and other illustrations. - Answer- Schematic drawings

Show more Read less
Institution
MCPPO Design And Construction
Course
MCPPO Design and Construction









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
MCPPO Design and Construction
Course
MCPPO Design and Construction

Document information

Uploaded on
June 21, 2024
Number of pages
14
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Freshy Oxford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
59
Member since
1 year
Number of followers
4
Documents
6904
Last sold
6 days ago

3.6

10 reviews

5
3
4
4
3
1
2
0
1
2

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions