100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ACI Concrete Field Testing Technician- Grade I Questions with 100% correct answers | verified | latest update 2024 $7.99   Add to cart

Exam (elaborations)

ACI Concrete Field Testing Technician- Grade I Questions with 100% correct answers | verified | latest update 2024

 3 views  0 purchase
  • Course
  • Institution

ACI Concrete Field Testing Technician- Grade I Questions with 100% correct answers | verified | latest update 2024

Preview 2 out of 12  pages

  • June 22, 2024
  • 12
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
ACI Concrete Field Testing Technician-
Grade I
A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for concrete containing
aggregate with particles not exceeding _____ in size, without the need for wet sieving
the concrete. - ANS-2 in. [50 mm]

A composite sample of concrete is required even if the only purpose for obtaining the
sample is to determine temperature. True of False? - ANS-False

A mallet weighing ____ must be used to tap the sides of the bowl after rodding each
layer. - ANS-1.25 +- 0.50 lb. (600 +- 200 g)

A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of
False? - ANS-False

A plastic container can be used for the measure in this method. True or False? -
ANS-False, measure must be steel or another suitable metal

According to ASTM C1064, what is one reason to take the temperature of concrete? -
ANS-Verify conformance to a specified requirement for temperature of concrete

After completing the strike-off procedure, what must be done before weighing the
measure and sample? - ANS-Clean off any excess concrete

After consolidation of the final layer, an excess of concrete ____ above the top of the
measure is considered optimum. - ANS-1/8 in. [3 mm]

After molding test specimens, you should wait two hours before moving them to the
location of initial storage. True or False? - ANS-False; the specimens must be moved
immediately

After rodding each layer, what should be done to the measure before adding another
layer of concrete? - ANS-Tap the sides of the measure smartly 10 to 15 times with the
mallet

After the final rodding, the sides of the slump mold should should be tapped lightly with
the tamping rod. True or False? - ANS-False

, After the temperature of the concrete is read, what is required? - ANS-Reporting of
temperature

Air meter bowls used for this test must conform to ASTM _____ and be calibrated for
volumee according to ASTM _____. - ANS-C231, C29

ASTM Method gives standardized requirements for _____, _____, _____, and _____, of
test specimens. - ANS-Making, curing, protecting, transporting

At the end of the procedure, the air meter is _____. - ANS-Disassembled and its
contents examined

Concrete mixtures with specified strengths of 6000 psi [40 MPa] or greater shall have
an initial curing temperature between __________. - ANS-68 and 78 degrees F [20 and
26 C]

Concrete samples from a truck mixer must be obtained before any water or admixtures
are added to the mixer at the job site. True or False? - ANS-False

Cylinders made for the purpose of determining when a structure may be put into service
shall be removed from the mold __________. - ANS-At the time of the removal of
formwork

Cylinders that are to be field cured are stored __________ and protected __________. -
ANS-In or on the structure as near to the point of deposit of the concrete represented as
possible; In as near as possible the same way as the formed work

During transportation, test specimens must be protected from damage due to _____,
_____, and _____. - ANS-Jarring, freezing temperatures, moisture loss

Each layer should fill approximately _____ the volume of the mold. - ANS-One-third

Field Curing is the curing method used when test specimens are to be used for
__________. - ANS-Determination of whether the structure is capable of being put into
service; Comparison with standard cured specimens test results or with results from
various in-place test methods; Adequacy of curing and protection of concrete in the
Structure, or Form or shoring removal time requirements

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller AnswersCOM. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81989 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling

Recently viewed by you


$7.99
  • (0)
  Add to cart