100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Nccco Exam/46 Complete Questions with Answers A+ Graded $8.49   Add to cart

Exam (elaborations)

Nccco Exam/46 Complete Questions with Answers A+ Graded

 2 views  0 purchase
  • Course
  • Institution

Nccco Exam/46 Complete Questions with Answers A+ Graded

Preview 1 out of 4  pages

  • June 30, 2024
  • 4
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
Nccco Exam/46 Complete Questions
with Answers A+ Graded
1% - -When hoisting personnel, within what percentage of level must a
telescopic boom crane be in order for the gross ratings in the load chart to
remain valid?

-100% - -According to ASME, what percentage of the manufacturer's crane
rating must not be exceeded if a load test is done on a repaired crane?

-1926.1400 - -What is the OSHA regulation governing cranes in construction

-2 broken wires in 6 rope diameters - -According to OSHA 1926.1413, how
many randomly distributed broken wires in rotation-resistant rope are cause
for replacement of the rope?

-20%. - -By what percentage do most manufacturers require a crane's load
chart capacity to be reduced by for duty cycle operations such as high-
volume concrete placement?

-45 ft. - -According to OSHA 1926.1408, what minimum clearance must be
maintained between any part of the crane/load and 850kV energized
overhead power lines.

-5 - -How many parts of line are required to hoist a 36,500 lb. load if the
maximum allowable line pull is 9,000 lbs.?

-50% - -According to OSHA, while hoisting personnel, the total load must
not exceed what percentage of the crane's rated capacity?"

-Anyone - -Who should an operator respond to a "stop" signal from?

-As long as it causes no visible distortion that would interfere with safe
operations - -Under which circumstance is a crack in the windshield of a
crane cab okay?

-As long as there is no less hazardous or practicable way - -Under which
circumstance does OSHA permits hoisting of personnel by crane?

-At least as far back as the depth of the wall below ground - -Where should
the crane's outrigger pads or tracks be placed when working at ground floor
level near a cellar wall?

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Victorious23. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $8.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76658 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$8.49
  • (0)
  Add to cart