100% de satisfacción garantizada Inmediatamente disponible después del pago Leer en línea o como PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

GFEBS Master Data Plant Maintenance Process Overview Post Test Questions And Answers Rated A+

Puntuación
-
Vendido
-
Páginas
2
Grado
A+
Subido en
02-07-2024
Escrito en
2023/2024

A new piece of equipment is being installed. All Preventive Maintenance requirements need to be identified. Who will perform this task? - B After the demand maintenance work is completed, the Order Maintainer sets the work order to technically complete (TECO), automatically settling any cost posted to the order, and finally sets the order to “Business closed.” - TRUE Cost and repair history is collected in GFEBS for the facility and equipment on which maintenance work is executed. - TRUE Demand Maintenance consists of scheduled order requirements, which are created as a result of the maintenance plan. - FALSE Demand Maintenance Orders: - B; IJOs that are executed externally by contractors are executed by a Plant Maintenance Project Work Order (PWO). - FALSE Maintenance activities depend on proper inventory material management. - TRUE Maintenance Plan Costing is based on all aspects required to perform the preventive maintenance task as outline in the PM plan. - TRUE Methods of Physical Inventory count include: continuous inventory, cycle counting, and random checking. - FALSE Operation Work Orders (OWO) include common level of support work such equipment repair. - FALSEOperations Work Orders are used to execute Preventive maintenance plans. - FALSE Operations Work Orders include running water treatment, utility, and boiler plants. - TRUE Preventive and Demand Work Orders rely on correct WBS numbers in order to get funding so that work can be accomplished. - TRUE The Order Maintainer: - C The Plant Maintenance Master Data Maintainer role can initiate, revise, and dispose of plant maintenance master data. - TRUE The Project Structure Controller and Project Planned WBS Cost Controller are involved in the RePrioritize IJO Project List step of the Annual Work Plan. - TRUE

Mostrar más Leer menos
Institución
GFEBS Master Data Plant Maintenance
Grado
GFEBS Master Data Plant Maintenance

Vista previa del contenido

GFEBS Master Data Plant Maintenance Process Overview Post Test . A new piece of equipment is being installed. All Preventive Maintenance requirements need to be identified. Who will perform this task? - B After the demand maintenance work is completed, the Order Maintainer sets the work order to technically complete (TECO), automatically settling any cost posted to the order, and finally sets the order to “Business closed.” - TRUE Cost and repair history is collected in GFEBS for the facility and equipment on which maintenance work is executed. - TRUE Demand Maintenance consists of scheduled order requirements, which are created as a result of the maintenance plan. - FALSE Demand Maintenance Orders: - B; IJOs that are executed externally by contractors are executed by a Plant Maintenance Project Work Order (PWO). - FALSE Maintenance activities depend on proper inventory material management. - TRUE Maintenance Plan Costing is based on all aspects required to perform the preventive maintenance task as outline in the PM plan. - TRUE Methods of Physical Inventory count include: continuous inventory, cycle counting, and random checking. - FALSE Operation Work Orders (OWO) include common level of support work such equipment repair. - FALSE

Escuela, estudio y materia

Institución
GFEBS Master Data Plant Maintenance
Grado
GFEBS Master Data Plant Maintenance

Información del documento

Subido en
2 de julio de 2024
Número de páginas
2
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
ACADEMICMATERIALS City University New York
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
600
Miembro desde
2 año
Número de seguidores
185
Documentos
10571
Última venta
8 horas hace

4.0

98 reseñas

5
53
4
13
3
21
2
3
1
8

Documentos populares

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes