100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Summary MRO Business $0.00

Summary

Summary MRO Business

1 review
 184 views  24 purchases
  • Course
  • Institution

A complete summary of the course MRO Business.

Last document update: 4 year ago

Preview 4 out of 43  pages

  • August 31, 2019
  • March 16, 2020
  • 43
  • 2018/2019
  • Summary

1  review

review-writer-avatar

By: demettuncer • 4 year ago

avatar-seller
AMSTERDAM
UNI ERSIT OF
APPLIED SCIENCES




1
A A A 2018-2019
MMAR
INE




Summary MRO Business
MRO




INE
MRO
B




B

,MRO Business – week 1
Engine Program Management

Maintenance Concepts
Continues Airworthiness Maintenance Program (CAMP)
All maintenance is based on the Continuous Airworthiness Maintenance Program, this
program defines per aircraft the maintenance requirements.

Example of References:
– Part M: Operator responsibilities
– FAA FAR 43 (Maintenance)
– FAA FAR 145: Repair station
– EASA Rulemaking

The maintenance organization is described in the MOE: Maintenance Organization
Exposition

Regulations and Controlling Authorities Aviation Industry is a tightly controlled
environment: FAA, EASA, CAA, CAAC, DGAC etc.

Training and Authorizations
Training of staff is performed in accordance with EASA Part 66 rules for certifying staff
– KLM E&M provides in house training through own training department:
o Type certificate training; ground engineers and mechanics
o Human factors training
o Specific technical training courses
– Engine services has dedicated training facility for training of Engine Services
staff
o Engine type training, dedicated skills etc.
– Where required, training is provided by OEM (Original Equipment
Manufacturer)

Quality Assurance and Quality Control and auditing system
Quality Control
– Quality Assurance and Control organization provides independent supervision
and monitoring of quality control, recognitions and authorizations
– Liaison between aviation authorities and KLM E&M
– Audit system:
o E&M facilities are frequently audited by both KLM quality control
organization as well as customers and national aviation controlling
bodies, audit remarks are required to be solved within a defined
timeframe.




Summary MRO Business 2

,On-Condition Maintenance Concept
– Consists primarily of monitoring the aircraft and engine performance at regular
intervals and determining when and which maintenance is required based on
the condition of certain operating parameters.
– Maintenance Tasks are described in MRI’s: Maintenance Required Inspections
performed at fixed intervals per certain number of flight hours.
– Engine inspections include:
o Borescoping the gaspath, using borescope equipment to inspect the
internal gaspath of the engine
o Oil system checks
o Visual zonal inspections
o Functional checks of certain systems

Hard Time Maintenance Concept
– Hard time maintenance concept is based on predetermined “hard times” to
remove components/engines for scheduled maintenance
– Regardless of actual condition
– Objective of hard time concept is to minimize any operational disruption
– Disadvantage: loss of any useable operational remaining life
– Not in use with many operators as main concept
– With certain reliability issues used in isolated cases for a component

Engine Inspections Techniques
Internal inspection of the gaspath condition.

Engine Boreblend
Internal blend repair of damaged airfoil

Thresholds
Counters to determine a required step in maintenance
– Expressed in:
o Flight hours
o Cycles (Take-Off and Landing cycles)
– Used with:
o Aircraft & Aircraft component maintenance
o Engine maintenance

Workscope Planning Guide
– Engines shop maintenance is described in document:
o Workscope Planning Guide (WPG)
§ Defines maintenance thresholds for individual modules and
components
§ Lists Air Worthiness Directives
§ Service Bulletins
§ Specific maintenance tasks based on operational experiences
§ Defines performance targets after maintenance




Summary MRO Business 3

, Engine Removal Reasons
Engines are removed for a variety of reasons:
– Replacement of life limited rotating parts like shafts and disks
– Performance deterioration:
o Thermodynamic: Loss of EGT margin (High Exhaust Gas Temperature)
o Mechanically: High Vibration levels of the rotor system(s)
– Oil leakage/consumption
– Damage to the gaspath due to:
o Deterioration
o Foreign Object Damage (example bird strikes)
– Findings during the regular inspections

Shopvisit Process & Workscoping
Engine overhaul process flow

Engine Introduction in shop;
preperation of
Incoming Engine Steering
Group meeting: work
removal documentation inspection scope determination




Cleaning/
Engine/Module/ Repair Assembly
Inspection
Assy dissasembly
process Process Process



Engine Final Inspection/ Engine
Performance Documentation released for
Test closure
Service
Stage Concept




Stage 0 Stage 1 Stage 2 Stage 3
Repair internal Assembly of assies
Receiving Disassembly
Completeness check Cleaning Repair external Assembly of
modules
Project start-up Parts disposal Replace
Incoming inspection Assembly of engine
Assembly
Workscope preparation Testrun
determination Final Inspection
Workscope approval
Declare serviceable
Engine dispatch



Summary MRO Business 4

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller aviationstudent1999. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $0.00. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79223 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
Free  24x  sold
  • (1)