100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

TEST FROM BIGSWPPP Questions & answers

Rating
-
Sold
-
Pages
17
Grade
A+
Uploaded on
04-07-2024
Written in
2023/2024

TEST FROM BIGSWPPP Questions & answers

Institution
Module

Content preview

TEST FROM BIGSWPPP

Motives for staying in compliance with stormwater objectives include:

A. Staying out of trouble with the law
B. Appeasing environmental groups
C. Making your boss happy
D. None of these answers - ANS-A

NPDES stands for:

A. National Pollution Division of Environmental Science
B. Non Pollution Discharge Elimination Standards
C. National Pollution Development Erosion Standards
D. National Pollutant Discharge Elimination System - ANS-D

The law that set into place stormwater regulations in the 1970's is...

A. The Federal Pollution Discharge Elimination Rules
B. The Stormwater Pollution Control Act
C. The Clean Water Act
D. The National Water Control Act - ANS-C

Regulations for managing Stormwater Activity on a construction site are outlined in
the...
A. NOI
B. NOT
C. NPDES
D. DOT - ANS-C

When should you read and understand your project Stormwater Pollution Prevention
Plan (SWPPP)?

A. After the project Owner calls you to their office
B. After an Agency inspector visits the job site
C. Immediately after project award and before you begin any site work
D. During project closeout - ANS-C

,Which of the following is a not an allowable stormwater discharge or non-stormwater
discharge

A. Discharge from dewatering activities
B. Discharge from borrow areas
C. Discharge from staging areas
D. Discharge of contaminated groundwater - ANS-D

Construction activity may begin

A. When the jurisdiction of operations specifies you can start
B. Immediately after equipment shows up on site
C. Right after a rain event
D. Once you have called the State - ANS-A

Waters that fail anti-degradation standards are placed on the ______ list.

A. 303d
B. none of the above
C. 404a
D. 301d - ANS-A

SWPPP certifications are signed by

A. The project engineer
B. An Officer of the Project Owner or an Officer of the General Contractor
C. Anyone with a pen
D. Any one on the project site - ANS-B

The Notice of Termination can be filed when

A. All construction, inside and outside the building is complete and final stabilization has
been verified as complete
B. At the end of the rainy season
C. Only offsite street work is left.
D. GC believes site meets permit requirements for final stabilization and notes this on a
daily report - ANS-A

Operators on a construction site are the entity in charge of plans and specification and
the entity who ...

, A. ... brings lunch to the site
B. ... is in charge of daily activities
C. ... visits the property weekly
D. ... sends reports to the owner and other interested parties - ANS-B

TRUE/FALSE

The document that must be completed, signed and submitted to the state to obtain
authorization to discharge is the NOT. - ANS-False

TRUE/FALSE

Construction sediment is not considered a potential pollutant source. - ANS-False

TRUE/FALSE

The Notice of Intent (NOI) must be submitted to the appropriate regulatory agency
before the Stormwater Prevention Plan is developed. - ANS-False

TRUE/FALSE

The name of the list of impaired waters is called the Total Maximum Daily Load (TMDL)
List - ANS-False

A well constructed SWPPP for your site should be...

A. Created as soon as it starts raining
B. Copied from a similar site
C. Generic
D. Site specific - ANS-D

The NOI must be submitted...

A. Prior to commencing construction
B. After commencing construction
C. By anyone conducting land disturbing activities
D. Once you bring contaminated materials on site - ANS-A

One necessary component of a good SWPPP is

Written for

Module

Document information

Uploaded on
July 4, 2024
Number of pages
17
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$11.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GOLDSOLUTIONS Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
12075
Member since
2 year
Number of followers
61
Documents
17241
Last sold
1 day ago

4.4

118 reviews

5
89
4
9
3
10
2
4
1
6

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions