Basics covered in Level 1 - ANS-Nuclear Testing
Speedy Moisture
Report Forms
Earthwork has to do with the roadway in what way? - ANS-Earthwork is the excavation
and placement of soils and materials supporting the proposed roadway.
In Earthwork what is a lift? - ANS-6" of compacted depth at full width
In Earthwork what is a Lot? - ANS-A lot is 1 lift at 500 ft or within compacted area.
Isolated compaction operations are separate lots.
Sampling at the roadway is done for - ANS-Done for base, sub grade, and
embankment.
Sampling is determined how - ANS-generated with random numbers usually by a
Verification Inspector
What is important about sampling at the roadway - ANS-Minimum of three
representative sample combined.
What is LIMS? - ANS-Laboratory Info Management System
The proctor theory is when compaction is achieved how - ANS-by inputting energy to
expel air and water in the soil voids
Compaction causes - ANS-An increase in unit weight, decrease in compressibility and
permeability.
The proctor is determined where and creates what - ANS-In a laboratory and
establishes a density standard to be used on the roadway
Lab proctors are created how - ANS-Material is gathered from the road and prepared
with different amounts of water then placed in molds and hammered
, What is a modified proctor used in - ANS-It is used in base, sub grade, MSE wall back
fill materials
Modified proctors are created how - ANS-With a 10lb hammer(rammer) on a 18" drop
with 56 blows per layers with 5 layers in total.
What is a standard proctor used in - ANS-It is used in embankment and structure back
fill materials
Standard proctors are created how - ANS-With a 5.5lb hammer(rammer) on a 12" drop
with 25 blows per layer with 3 layers in total
Comparison between VT and QC density test tolerance - ANS-2 lbs/pcf
What is the STRG - ANS-Sampling, Testing, and Reporting Guide (state wide)
A job guide schedule is - ANS-project specific
The material identification number for embankment in the laboratory is - ANS-004L
The material identification number for embankment in the field is - ANS-004F
The material identification number for base is - ANS-030
PP is short for - ANS-project personel
Sampling in the field it is important to - ANS-sample each type of material and have
enough for a representative sample
When to secure samples - ANS-After material is placed but before compaction effort is
applied
Sample transmittal card the source uses what code for the jobsite - ANS-08
For material description the minimum is always - ANS-Color and texture
On sample bags be sure to put - ANS-Project #
Sample #
Location
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller EXAMQA. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $11.49. You're not tied to anything after your purchase.