__________ evaluates the environmental effects of the life of a service,
product, or project, inputs
and outputs into the system.
A. Life Cycle Analysis
B. Location Valuation Factor
✅✅
C. Life Cycle Cost
D. Waste Hierarchy - -A. Life Cycle Analysis
____________ is a voluntary, consensus-based national standard for
developing high-performance, sustainable buildings and interiors.
A. Living Building Challenge
B. United States Green Building Council
✅✅
C. Leadership in Energy and Environmental Design
D. Green Building Certification Institute - -C. Leadership in Energy
and Environmental Design
1. Which of the following water efficiency measures might add the most
to construction costs?
A. Low-flow faucets and showers
B. Dual-flush toilets and waterless urinals
✅✅
C. Grey water reuse system
D. Rain water harvesting for irrigation - -C. Grey water reuse
system
A code compliant water closet uses how much water?
A. 1.6 gallons per minute
B. 1.6 gallons per flush
✅✅
C. 1.2 gallon per flush
D. gallons per flush - -B. 1.6 gallons per flush
A commissioning authority is typically hired by:
A. The general contractor
B. The owner
✅✅-B. The owner
C. The architect
D. The Green Building Certification Institute -
,A commissioning report will typically include all of the following, except:
A. A summary of the results of functional testing
B. A confirmation of compliance with all LEED construction credit
requirements
C. Confirmation that the building systems adhere to the Owner's Project
Requirements and Basis of
Design
✅✅
D. Identification of system deficiencies and recommendations for
corrective action - -B. A confirmation of compliance with all LEED
construction credit requirements
A community college is planning to construct a new building adjacent to
an existing facility. The building program includes administrative offices,
maintenance facilities, one classroom, and a multipurpose room. Which
LEED rating system is most appropriate for this project?
A. LEED for Existing Buildings: Operation & Maintenance
B. LEED for Building Design & Construction: Schools
C. LEED for Building Design & Construction: New Construction
✅✅
D. LEED for Building Design & Construction: Core & Shell
E. Both B & C - -E. Both B & C
A contractor is beginning site preparation for a new building seeking
LEED certification. The site contains an existing building that must be
demolished. As the contractor begins implementing the
Construction Waste Management Plan, which of the following will be
included in the waste diversion calculations? (select 2)
A. Concrete rubble from demolished sidewalks
B. Soil and rock from the excavation for new foundations
C. Trees and shrubs removed during land clearing
D. Brick, wood and roofing material from the demolished building
✅✅
E. Flooring and insulation containing asbestos from the demolished
building - -A, D
A. Concrete rubble from demolished sidewalks
D. Brick, wood and roofing material from the demolished building
A developer is moving their corporate office into one of the existing
buildings that they own. Their new offices will occupy floors 2 through 4
, of the seven-story building. Which LEED rating system would be most
applicable to certify this project?
A. LEED BD+C: Core & Shell
B. LEED O+M: Existing Buildings
✅✅
C. LEED BD+C: New Construction
D. LEED ID+C: Commercial Interiors - -D. LEED ID+C:
Commercial Interiors
A developer is proposing a new 20 story office tower. They have already
signed a major tenant who will occupy the top seven floors and the
tenant improvement of this space will be included in the primary
construction scope. Which LEED rating system is most appropriate for
this project?
A. LEED BD+C: New Construction
B. LEED BD+C: Core & Shell
✅✅
C. LEED ID+C: Commercial Interiors
D. LEED O+M: Existing Buildings - -B. LEED BD+C: Core & Shell
A developer is proposing a new office building on a former industrial site
less than 1/4 mile from downtown, but a freeway separates the site from
the restaurant and shopping district. In order to improve the community
connectivity of this project, the developer could:
A. Incorporate a strip mall and housing into the proposed development
B. Propose a jogging trail and bike path connecting to a nearby park and
community center
C. Propose a gravel path be added to the one road that connects the
project site to downtown via a
freeway underpass and narrow shoulder
✅✅
D. Propose to provide discounted transit passes to future tenants of the
office building - -B. Propose a jogging trail and bike path
connecting to a nearby park and community center
A developer is proposing a three-story, market-rate apartment complex
with a clubhouse and pool in the center. The project will include a central
boiler for heating and hot water, but each unit will be separately metered
for electricity. Which LEED rating system would be most applicable to
certify this project?
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller examthreads. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $11.49. You're not tied to anything after your purchase.