100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Naslca Virginia Exam – Questions With A+ Solutions

Rating
-
Sold
-
Pages
17
Grade
A+
Uploaded on
22-07-2024
Written in
2023/2024

Naslca Virginia Exam – Questions With A+ Solutions

Institution
VA Contractor
Course
VA Contractor

Content preview

Naslca Virginia Exam – Questions With A+ Solutions What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of license? Right Ans - $500 fine per day for each day of violation plus penalties for a misdemeanor.
All Class A contractor licensure applications MUST include Right Ans - information on the knowledge, skills, and abilities of the applicant.
What is the PRIMARY purpose of licensing? Right Ans - Protect the health and welfare of the public.
When a claimant is paid funds from the Contractors Recovery Trust Fund Right Ans - the contractor's license is revoked. !!!
The application for licensure MUST include Right Ans - the business address of the proposed designated employee.
Which of the following is a requirement for a joint venture? Right Ans - Either the joint venture or each contracting party of the joint venture must be licensed.
All of the following must be licensed EXCEPT Right Ans - a material supplier who advises a contractor.
How much is the Class A initial license fee? Right Ans - $200
A licensee's name change MUST be reported to the Board within a MAXIMUM of how many days? Right Ans - 30 days
According to the Board Rules and Regulations, a full-time employee is one who works a MINIMUM of how many hours per week? Right Ans - 30 hours.
A firm desiring to be licensed as a Class B contractor MUST have a MINIMUM net worth of Right Ans - $15,000.
According to the Board Rules and Regulations, which of the following could be
a qualified individual? Right Ans - Any full-time employee. An appeal of the local building official's decision to refuse to grant a modification to the USBC MUST be made to the local building board within a MAXIMUM of how many days? Right Ans - 90 days.
A building official MUST issue a certificate of occupancy for a building that meets all the requirements for a certificate within a MAXIMUM of how many working days after the certificate was requested? Right Ans - 5
Additions to buildings MUST comply with Right Ans - the current code for new construction.
When MUST the work be stopped following the issuance of a stop work order?
Right Ans - Immediately
Who is to be in charge of a local building department? Right Ans - Building official.
Contractors who are assessed a fee to support the Transaction Recovery Fund MUST pay this fee within a MINIMUM of how many days from when the assessment fee notice was mailed? Right Ans - 45 days
Contractors will be assessed a fee for the Transaction Recovery Fund whenever the fund balance is less than Right Ans - $400,000.
Payments made by the Transaction Recovery Fund to claimants may include an amount for Right Ans - attorneys' fees.
A contract for which of the following types of structures may be subject to recovery from the Transaction Recovery Fund? Right Ans - Residential only.
A verified claim for payment from the Transaction Recovery Fund MUST occur
within a MAXIMUM of what period of time from the date the claimant was awarded a final judgment? Right Ans - 12 months.
An appeal of a final decision of a county on an erosion control plan MUST be filed within a MAXIMUM of how many days? Right Ans - 30 days. Temporary erosion and sediment control measures MUST be removed within a MAXIMUM of how many days after the final site stabilization? Right Ans - 30 days.
Which of the following statements about a sole proprietorship is TRUE? Right Ans - The business, or any part of it, can be sold, altered, or exchanged at
will.
What type of business organization allows people to share financial resources? Right Ans - Partnership.
Which of the following estimating methods is typically used by the architect rather than the contractor? Right Ans - Conceptual estimate.
Equipment needs for a project are BEST estimated by Right Ans - calculating the number of hours or days it is needed.
What should be added to wage rates to ensure accuracy in estimating labor for
a project? Right Ans - Labor burden.
A reason for using a lower than usual profit markup for a specific project could be to Right Ans - cover company overhead costs.
Which of the following is a TRUE statement about estimating? Right Ans - Both overestimating and underestimating costs could have disastrous consequences.
A contractor should do all of the following when estimating a project EXCEPT Right Ans - assume ideal conditions
What MUST be included in an estimate for a job? Right Ans - Materials, labor, equipment, and overhead costs.
Costs that relate to construction activity but are NOT easily identifiable for a specific project are considered Right Ans - project overhead.
All of the following are considered general conditions that could affect costs directly associated with a specific project EXCEPT Right Ans - profit margin

Written for

Institution
VA Contractor
Course
VA Contractor

Document information

Uploaded on
July 22, 2024
Number of pages
17
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudyHall Chamberlain School Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
1309
Member since
3 year
Number of followers
826
Documents
16723
Last sold
6 days ago
The Study Hall Shop ~ "Where learning meets success"

Dear Stuvia Community, As a passionate and dedicated learner, I believe that knowledge is most powerful when shared. With this mindset, I’m thrilled to introduce my Stuvia account, where I aim to provide valuable, high-quality study resources that empower students like you to excel in your academic journey. Whether you’re looking for detailed notes, comprehensive study guides, or insightful exam preparation materials, I am committed to making your study experience more efficient and effective. My goal is to simplify complex topics, break them down into digestible content, and offer fresh perspectives that will help you gain deeper understanding and achieve academic success. I firmly believe that learning should be engaging, accessible, and rewarding. That’s why I’ve worked hard to craft resources that are not only informative but also easy to follow and enjoyable. As a fellow student, I understand the challenges that come with studying, and I’m here to make that process a little bit easier for you. Let’s make learning a journey, not a chore. Explore my collection of notes, exams and study materials, and feel free to reach out if you need anything more. Together, we can achieve greatness! Thank you for considering my contributions to your academic success. Best Wishes! :)

Read more Read less
3.8

220 reviews

5
103
4
40
3
38
2
9
1
30

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions