100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
82 Final Exam Review OPMA 3306 Questions And Answers $7.99   Add to cart

Exam (elaborations)

82 Final Exam Review OPMA 3306 Questions And Answers

 4 views  0 purchase
  • Course
  • OPMA 3306
  • Institution
  • OPMA 3306

"Projected available balance" is a term referring to unsold finished goods inventory - ️️False 100% inspection is justified when the cost of inspection is low - ️️False A BOM file is also called - ️️Product Tree A BOM file is also called which of the following - ️️Product Tree A...

[Show more]

Preview 2 out of 5  pages

  • August 2, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • OPMA 3306
  • OPMA 3306
avatar-seller
jackline98
82 Final Exam Review OPMA 3306
Questions
"Projected available balance" is a term referring to unsold finished goods inventory - ✔ ✔ False

100% inspection is justified when the cost of inspection is low - ✔ ✔ False

A BOM file is also called - ✔ ✔ Product Tree

A BOM file is also called which of the following - ✔ ✔ Product Tree

A free trade zone operates under different rules and laws than a foreign trade zone - ✔ ✔ False

A lot for lot (L4L) lost sizing technique does not take into account setup costs or capacity limitations - ✔
✔ True

A master production schedule is an input to a material requirements planning (MRP) system - ✔ ✔
True

A matrix project structure is often referred to as a "skuckworks" - ✔ ✔ False

A modular bill of materials in the term for an item that can be produced and stocked as a subassembly -
✔ ✔ True

A modular bill of materials includes items with fractional options - ✔ ✔ False

A opportunity flow diagram is used to separate the value added from the non value added steps in a
process - ✔ ✔ True

A product tree can do which of the following - ✔ ✔ help to compute component usage

A project can be subdivided into which of the following - ✔ ✔ work packages

A project milestone is a specific event to be reached by a particular point of time - ✔ ✔ True

A quality guru named Joseph M Juran defined quality as fitness for use - ✔ ✔ True

A quality guru named Philip Crosby defined quality as fitness for use - ✔ ✔ False

A quality guru named Phillip Crosby defined quality as conformance to requirements - ✔ ✔ True

An analytical tool used in six-sigma quality improvement programs is which of the following - ✔ ✔
checksheets

, An event unit package is a subdivision of a project - ✔ ✔ False

An example of assignable variation in a production system may be that workers are not identically
trained - ✔ ✔ True

An input to the material requirements planning (MRP) system is an exception report - ✔ ✔ False

An input to the material requirements planning (MRP) system is an inventory records file - ✔ ✔ True

An operational goal of total quality management is the careful design of the product or service - ✔ ✔
True

An opportunity flow diagram as part of a six sigma quality improvement process might be found in
which DMAIC category - ✔ ✔ Improve

An output of MRP is a bill of materials (BOM) file - ✔ ✔ False

AQL stands for accepting questionable lots in production quality management - ✔ ✔ False

Breakthrough projects are those that provide fundamental improvements to existing products - ✔ ✔
False

Conformance quality is a strategic decision for a firm - ✔ ✔ False

Design of Experiments (DOE) is sometimes referred to as multivariate testing - ✔ ✔ True

Design of Experiments (DOE) refers to the work done before production of early model prototypes of a
new product - ✔ ✔ False

Design quality in products refers to the degree to which a products or service specifications are met - ✔
✔ False

Design quality refers to the inherent value of the product in the marketplace - ✔ ✔ True

Facility location analysis considers the competitive imperative to be close to customers as to timeliness
of deliveries - ✔ ✔ True

Failure mode and effect analysis is used in six sigma projects. It involves which of the following - ✔ ✔
calculating a risk priority number for each possible failure

For which of the following should we use a "p" chart to monitor process quality - ✔ ✔ Defective
electrical switches

Freezing the master schedule is - ✔ ✔ done to avoid the chaos of expediting and resultant overdue
orders

Generally, determining lost sizes in MRP systems is simple - ✔ ✔ False

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller jackline98. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79373 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart