1. When creating an OBSL work order, the 4 low priority list item is selected. - ANS-b. FALSE
2. When a change is made to the OBSL BOM, a new XML file is received into GCSS-Army via
the ______, which results in an update to the existing OBSL BOM. - ANS-d. SAP Business
Workplace
3. The Open Web Service (OWS)/Universal Data Exchange (UDEx) Interface links information
from the ______ to GCSS-Army. - ANS-b. Logistics Support Vessel (LSV)
4. When installing equipment a(n) _____notification must be created. - ANS-b. D1 Notification
5. The intent of the OBSL work order is to be able to compare the OBSL material requirement
quantities with the ______. - ANS-a. On-hand material quantities
6. The nomenclature for the OBSL work order description is the OBSL, followed by the
watercraft vessel ______. - ANS-c. Advanced Shipment Notification (ASN) Number
7. True or False? The OBSL work order is not to be released. - ANS-a. TRUE
8. The OBSL work order that is created for a watercraft mission is used for material
replenishment. - ANS-b. FALSE
9. The ______ is used to view the provisional on-hand material quantities. - ANS-b. BOM
History (ZBOMHIST)
10. True or False? The Material Situation Report (/ISDFPS/DISP_MAT_SIT) is used to establish
and to manage the provisional safety stock requirements. - ANS-a. TRUE
11. The ______ transaction is used to create the OBSL/On-Hand Material Quantities
spreadsheet. - ANS-d. Equipment Status Report (Z_EQUST)
12. The ______ transaction is used to display the open watercraft OBSL work order. - ANS-a.
Equipment Situation Report (/ISDFPS/DISP_EQU_SIT)
13. The ______ transaction is used to create the watercraft OBSL work order. - ANS-b. Create
Order (IW31)
14. Operators are entered into a ground equipment dispatch where as ______ are entered into
a watercraft equipment dispatch. - ANS-c. Crew Members