100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
DBIA- Principles of Design-Build and Post Award And Contracts Questions And Answers With 100% Correct Answers $7.99   Add to cart

Exam (elaborations)

DBIA- Principles of Design-Build and Post Award And Contracts Questions And Answers With 100% Correct Answers

 7 views  0 purchase
  • Course
  • DBIA- Principles of Design-Build and Post Award An
  • Institution
  • DBIA- Principles Of Design-Build And Post Award An

Contract Format - cost per piece - Unit Price Single point of responsibility for both design & construction is an attribute of what delivery method? - Design Build Bill directing A/E's selected on qualifications, what year? - Brooks Bill 1972 Allows all federal agencies to utilize Design-Build....

[Show more]

Preview 2 out of 10  pages

  • August 3, 2024
  • 10
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • DBIA- Principles of Design-Build and Post Award An
  • DBIA- Principles of Design-Build and Post Award An
avatar-seller
ACADEMICMATERIALS
DBIA- Principles of Design-Build and
Post Award And Contracts
Contract Format - cost per piece - Unit Price



Single point of responsibility for both design & construction is an attribute of what delivery method? -
Design Build



Bill directing A/E's selected on qualifications, what year? - Brooks Bill 1972



Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing
Design-Build. - Clinger Cohen Act/Defense Procurement Reform Act 1996



The level of quality that any average Design Professional would be able to perform given the
circumstances. - Standard of Care



Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they want), -
Design Bid Build



Project Delivery method allowing the contractor to come on board very early in design for
preconstruction services yet maintains separation between Designer and Builder contractually. -
CM at Risk



Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing
incremental packages. - Design Build



Procurement Method - Most Familiar - Low Bid



Procurement Method - Common for A/E - Negotiated (Qualifications Based)

, Procurement Method - Qualifications and Price - Best Value



Procurement Method - Direct - Sole Source



Contract Format w/ agreed upon fixed price - Lump Sum



Contract Format - contractor reimbursed for actual cost plus an agreed upon percentage - Cost
Plus Fee



Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only
up to a certain amount. - GMP (Guaranteed Maximum Price)



Contract Format - established cost/benchmark determined jointly by project team. - Target Price

Federal Government passed bond requiring payment and performance bonds on all public works, what
year? - Miller Act 1935



Successful Design Build requires _____ & _______ between participants - Trust, Flexibility



Singular responsibility for both design & construction was first codified by ____ - Hammurabi



Owner provided items such as 20% design or more and provides prescriptive specs at RFP. -
Bridging Documents



Owner is responsible for implied warranties in the sufficiency of the specifications. - Spearin
Doctrine



____ ____ should identify end results. - Performance Requirements




The process of checking milestones along the way for completeness. - Substantiation

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller ACADEMICMATERIALS. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

64438 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart