100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CNST Ch.4-6 Quiz || with 100% Correct Answers. $10.59   Add to cart

Exam (elaborations)

CNST Ch.4-6 Quiz || with 100% Correct Answers.

 7 views  0 purchase
  • Course
  • CNST Ch.4-6
  • Institution
  • CNST Ch.4-6

addendum correct answers A change or addition to a contract documents issued after the documents have been released but before the bids are due Change order correct answers Request made by the owner to add or subtract features to the scope of the project resulting in changes to the contract C...

[Show more]

Preview 2 out of 5  pages

  • August 4, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CNST Ch.4-6
  • CNST Ch.4-6
avatar-seller
FullyFocus
CNST Ch.4-6 Quiz || with 100% Correct Answers.
addendum correct answers A change or addition to a contract documents issued after the
documents have been released but before the bids are due

Change order correct answers Request made by the owner to add or subtract features to the scope
of the project resulting in changes to the contract

Contract documents correct answers The drawings, conditions, terms, and specifications setting
forth the requirements for constructing the project.

Guaranteed Maximum Price (GMP) correct answers A contract methodology in which the
contractor is reimbursed for actual costs of materials, labor, equipment, subcontracts, overhead,
and profit up to a maximum fixed-price amount. Any costs over the maximum price shall be
borne by the contractor. Any savings below the maximum price will revert to the owner. This
type of contract is often implemented when design is less than 100 percent complete.

Perspective drawing correct answers A three dimensional drawing representing width length and
height of a structure

as-built drawings correct answers Record drawings completed by the contractor and turned over
to the owner at the end of the project identifying any changes or adjustments made to the
conditions and dimensions of the work relative to the original plans and specifications.

Time and materials correct answers Another name for a cost-plus-fee contract. These are the two
cost factors that are reimbursed under a cost-plus-fee contract. Time equates to the cost of the
labor, and materials equate to the cost of the building products used in the construction.

Commissioning correct answers a process of testing and checking all equipment and systems
within the facility at the end of a project to assure proper functioning and operation. This may
also include the training of owner personnel in the operation and maintenance of the equipment

Punch list correct answers The minor adjustments, repairs, and work items that must be done
before substantial completion can be achieved. The list is prepared jointly by the owner,
architect, and contractor. The architect confirms completion of each item on the list.

Substantial completion correct answers The point at which all punch list work has been
completed and the owner can occupy or take possession of the new facility.

unforseen conditions correct answers Unknown physical conditions at the site that were not
anticipated by the owner or the contractor

Working drawings correct answers The final detail drawings used for construction these are also
called "construction documents" or "contract documents"

, Commitment manager correct answers The practice of being aware of each team members tasks
and deliverables, checking in with them periodically, and helping when needed for the success of
the project

Committed listening correct answers Listening intently to another person to make sure that you
clearly understand what they mean by the words they are speaking without judging, assessing, or
negating what they are saying.

Committed speaking correct answers speaking with intention and purpose, using specific words
to clearly convey your exact meaning

Emotional intelligence correct answers The capacity to be aware of, control, and express one's
emotions, and to handle interpersonal relationships judiciously and empathetically

Integrative thinking correct answers The ability to face constructively the tension of opposing
ideas and, instead of choosing one at The expense of the other, generate a creative resolution of
the tension in the form of a new idea that contains elements of the opposing ideas but is superior
to each

Land development correct answers Changing the landscape to alter landforms, subdivide existing
property, or changing current property usage for new purposes

Land entitlement correct answers The legal process of obtaining approvals from a governing
municipality to allow for the development of a certain building type.

Open book philosophy correct answers A practice of information transparency among all the
project parties which benefits the client by leading to open dialogue, a better understanding of
the design, and its impact on budgets and schedules.

Procurement correct answers Acquisition of goods and services

Reliable promising correct answers Developed by the LCI, reliable promising and personal
commitment making show respect for people and build trust among team members. Reliable
promising creates ownership and responsibility and helps shift the culture from one of "holding
people accountable" to a culture of "being accountable." Reliable promising reduces rework,
defects, and waste—and increases productivity.

Strategic foresight correct answers A planning-oriented practice based on the study of futures
and statistics.

Teaming enterprise correct answers Finding ways to establish a reciprocal working environment
among your most trusted and aligned business and trade partners to create efficiency and
effectiveness.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller FullyFocus. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.59. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

62890 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.59
  • (0)
  Add to cart