SAFe POPM - Section 2 | Questions & Answers (100 %Score) Latest Updated 2024/2025 Comprehensive Questions A+ Graded Answers | With Expert Solutions $13.48   Add to cart

Exam (elaborations)

SAFe POPM - Section 2 | Questions & Answers (100 %Score) Latest Updated 2024/2025 Comprehensive Questions A+ Graded Answers | With Expert Solutions

 4 views  0 purchase
  • Course
  • SAFe POPM
  • Institution
  • SAFe POPM

SAFe POPM - Section 2 | Questions & Answers (100 %Score) Latest Updated 2024/2025 Comprehensive Questions A+ Graded Answers | With Expert Solutions

Preview 2 out of 7  pages

  • August 4, 2024
  • 7
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • SAFe POPM
  • SAFe POPM
avatar-seller
VasilyKichigin
SAFe POPM - Section 2 | Questions & Answers (100 %Score) Latest Updated 2024/2025
Comprehensive Questions A+ Graded Answers | With Expert Solutions


Set-Based Design (SBD) - Set-based design is a practice that maintains multiple requirements and design
options for a longer period in the development cycle. Empirical data is used to narrow focus based on
the emergent knowledge presented at integration-based learning points. Produces more optimal
technical and economic outcomes.



Set-Based Design AKA - Set-Based Concurrent Engineering (SBCE)



Which Principle does Set-Based Design Apply to? - Principle 3: Assume variability; preserve options



Four Critical Errors of Phase-Gate Milestones - - Centralizing requirements and design decisions in siloed
functions that do not actually build the system

- Forcing too-early design decisions and false-positive feasibility

- Assuming a point solution exists and can be built correctly the first time

- Making up-front decisions creates large batches of requirements, code, tests, and queues leading to
large-batch handoffs and delayed feedback.



Incremental Milestones vs. Phase-Gates - System is build in increments and each integration point
demonstrates some evidence of feasibility of the solution in process. Each milestone involves
requirements, design, development, and testing all producing an increment of value.



Which Principle does Incremental Milestones belong to? - Principle 5 - Base milestones on objective
evaluation of working systems



Benefits of decentralized decision-making - - Reduces delays

- Inproves product development flow and throughput

- facilitates faster feedback & more innovative solutions

- Higher levels of empowerment (additional benefit)

, Characteristics of decisions that should be Centralized - - Infrequent: not urgent and deeper
consideration is appropriate (e.g., product strategy, international expansion)

- Long-lasting: Unlikely to change in the short-term (e.g., commitment to tech platform or realignment
around value streams)

- Provide economies of scale: Deliver large and broad economic benefits (e.g., standard tooling,
offshoring)



Characteristics of decisions that should be Decentralized - - Frequent: problem is recurrent and common
(e.g., backlog prioritization, response to defects)

- Time-critical: High cost of delay (e.g., point releases, customer emergencies, dependencies w/ other
teams)

- Requires Local Information: Need specific local context (e.g., specific customer needs, significant design
problem, self-organization to emerging challenge)



Decentralized decision-making applies to what Principle? - Principle 9: Decentralize decision-making



Who leads PI Planning preparation? - PM takes the lead preparing for PI Planning, supported by the PO.
They own feature priorities.



Agile team owns what at PI? - Story planning and high-level estimates



Architect/Engineering and UX have what role in PI Planning? - Work as intermediaries for governance,
interfaces and dependancies



Inputs to PI Planning (PI Planning Prep) - - Create/update Vision and Roadmap

- Socialize the Top 10 features to set expectations for the PI Planning meeting



Who ensures the Vision and Program/Team Backlogs are aligned to Strategic Themes? - PMs collaborate
w/ Lean Portfolio Management.



Non-functional requirements - Constraints on the services or functions offered by the system such as
timing constraints, constraints on the development process, standards, etc. (e.g., performance,
reliability, platforms).

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller VasilyKichigin. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.48. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.48
  • (0)
  Add to cart