100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CESSWI Part 2 – Questions With Detailed Answers $17.99   Add to cart

Exam (elaborations)

CESSWI Part 2 – Questions With Detailed Answers

 5 views  0 purchase
  • Course
  • CESSWI Part 2 –
  • Institution
  • CESSWI Part 2 –

CESSWI Part 2 – Questions With Detailed Answers Secondary Containment: imp consid - ANS-1) Secondary containment must have capacity 110% of the volume of the largest container in storage area 2) containment can exist as metal container, bermed areas or excavated pits with liner 3) shou...

[Show more]

Preview 4 out of 40  pages

  • August 4, 2024
  • 40
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CESSWI Part 2 –
  • CESSWI Part 2 –
avatar-seller
laurenjames
CESSWI Part 2 – Questions With Detailed
Answers
Secondary Containment: imp consid - ANS-1) Secondary
containment must have capacity 110% of the volume of the
largest container in storage area
2) containment can exist as metal container, bermed areas or
excavated pits with liner
3) should be regular drained and disposed of properly
4) a roof covering greatly reduces amount of water
5) should be located away and down stream of all critical and
sensitive areas and traffic

Secondary Containment: inspection - ANS-1) installed as shown
on plan with proper capacity
2) ensure drain plugs are in place
3) clean up materials on site with spcc
4) Insure materials are palletized'5) check for damage to
secondary containment

Secondary Containment:maint - ANS-1) Repair damage to
storage vessel
2) replace drain plugs that are not in place
3) pump out and properly dispose of standing product and/or
rainwater
40 repair damage due to corrosion, dents, holes and leaks

Secondary Containment: poten assoc bmps - ANS-1) materials
management
2) sanitary and waste management
3) equipment maint and cleaning
4) concrete wash out area

,multi purp basin:Desc & Purp - ANS-a perm struct bmp that acts
as a temp sediment basin during construct, and as perm water
quality and quantity device once soil dist activities have been
completed.

,Existing Veg, Desc/Purp - ANS-temp or perm bmp desi to stab
soil and remove sups part from sheet flow runoff.

Existing Veg, Objectives - ANS-1) Site Plan and Mang
2) Erosi Cont
3) Sedi Cont
4) Post-Cons Mang

Existing Veg, applic - ANS-1) Areas within site where no const
activity is occur
2) Areas where local, state and fed govt require preservation
3) Areas where existing veg can be utilized for eros, sedi, and
storm water quality.

Existing veg: inspection - ANS-1) Accord to regu timetables
2) erosi and damage veg
3) sufficient moisture to ensure growth
4) veg is well stab
5) adequate cover
6) debris and litter
7) invasive exotics

Existing veg: maint - ANS-1) only disturb area for construct
2)irrigate dry seasons
3) remove see, and replant if need be
4) replant or rework buffer strips
5) mow and cut perennial weeds
6) remove all trash and debri
7) treat invasive and noxious species

, Sched/Sequ, purp/descrip - ANS-Temp, procedural control that
involves creating a written plan to address neck bmps and
sequencing of construct activities to mitigate the erosive effects of
wind,water and construct activities.

Sched/Sequ: object - ANS-1) site planning & management
2) erosion control
3) sediment control

Sched/Sequ: applications - ANS-1) develop timetables for certain
activities, paretic during rainy season

Sched/Sequ: inspect - ANS-1) inclusion of sched/seq as a bmp in
the plan
2) ached site activities mirroring ached activites.

Sched/Sequ: maintanence - ANS-1) modify ached of active when
changes are warranted
2) modify ached of active prior to rainy season to reflect updated
bmp info

Hydroseed: Des& purp - ANS-Temp or perm bmp designed to
reduce erosion and runoff by applying mix of seed, fert and
stabilizing emulsion.

Hydroseed: object - ANS-1) erosion control
2) good housekeeping/ materials management
3) post construct management

Hydroseed: targeted pollut - ANS-1) sediment
2) nutrients
3) metals
4) ph

Hydroseed: imp consid - ANS-1) need adequate moisture

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller laurenjames. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $17.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79373 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$17.99
  • (0)
  Add to cart