NC Commercial Contractor Exam
Footing, underslab(as appropriate), foundation (wood frame), rough-in, building framing,
insulation, fire peotection, finals - ANS-Name the 8 general inspections
Shall be made after the trenches are excavated, all grade stakes are installed, all reinforcing
steel and supports are in place and tied, and all necessary forms are in place and braced and
before any concrete is placed - ANS-Footing Inspection
shall be made after all materials and equipment to be concealed by the concrete slab are
completed. - ANS-Under-slab inspection
shall be made after all foundation supports are installed - ANS-Foundation inspection, crawl
space
shall be made when all building framing and parts of the electrical, plumbing, fire protection, or
heating-ventilation or cooling system that will be hidden from view in the finished building have
been placed but before any wall, ceiling finish or building insulation is installed. - ANS-Rough-in
inspection
Shall be made after the roof(excluding permanent roof coverings), wall ceiling and floor flooring
is complete with appropriate blocking, bracing and fire stopping in place. Must be in place for
inspection: pipes, chimney and vents, flashing for roofs and chimney, insulation baffles, all lintels
if bolted to framing (if supported on masonry work may continue). - ANS-Building Framing
Inspection
Shall be made after an approved building framing and rough-in inspection and after the
permanent roof covering is installed, with all insulation and vapor retarders in place, but before
any wall or ceiling covering is applied. - ANS-Insulation inspection
Shall be made in all buildings where any material is used for fire protection. The permit holder or
his agent shall notify the inspection department after all fire protection materials are in place.
Fire protection materials shall not be concealed until inspection and approved by inspector. -
ANS-Fire Protection Inspection
Where the general statutes require, no permit shall be issued unless the construction
documents (drawings and specifications), bear the North Carolina seal of a registered design
professional. - ANS-Design Professional Seal Required
1) family residence up to 8 units attached with grade level exist, with no other buildings or
residents
2) building upon any farm that's doesn't substantially involve the health or safety of the public
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller modockochieng06. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $7.99. You're not tied to anything after your purchase.