Stormwater Erosion and Sedimentation Control
Exam
2 soil amendments usually required to permanent seeding - ANS-Fertilizer and lime
3 beneficial functions of mulch - ANS-Protects soil from raindrop erosion
Moderates soil temperature
Moderates soil moisture
Reduced velocity of overland flow
Improves soil texture and/or nutrients
Control/reduce weeds
3 Biological Effects of Erosion and Sedimentation - ANS-Reduced light for aquatic plants
Clogs fish gills
Impairs spawning
Disrupts food chain
Blankets bottom
Suppresses aquatic life
Disrupts ecosystem
3 Physical Effects of Erosion and Sedimentation - ANS-Increased Flooding
Reduced hydraulic capacities in Rivers, Streams, Channels, Reservoirs
Increased maintenance of stormwater systems
Increased water treatment costs
Decreased recreational value
3 purposed of soil roughening - ANS-Aid in establishment of vegetative cover
Reduce runoff velocity
increase infiltration
reduce erosion
Provide for sediment trapping
70% or greater stabilization requires - ANS-14 days to submit NOT
A BMP is not performing - ANS-Replace it with an alternative
A conveyance system is what? - ANS-Stormwater systems
A floating turbidity curtain is designed to ____ sediment laden water and allow enough ____ for
sediments to settle out of suspension - ANS-Contain
Time
A stand of vegetation is considered fully established after ____ - ANS-1 year
A type 3 floating turbidity curtain may be used in considerable flow conditions, meaning less
than ___ feet per second or ___ knots - ANS-5
3
Anchor lines shall be attached to ____ not the_____ - ANS-Bouys
Bottom of the curtain or float
Areas that are at rough grade for 14 days or more should receive_____ seeding immediately -
ANS-Temporary
Average Usable Life of Silt Fence - ANS-6 months
Before discharging chemically treated water, what should you test for? - ANS-PH
Turbidity limits
Can the SWPPP exceed the requirements under part 4 of CGP? - ANS-No
Can you transfer your NOI to a new contractor? - ANS-No
Clay and Much - ANS-Soil particles smaller than .002mm
Cause most erosion and turbidity problems in Florida and World
Construction activity that results in disturbing ___ acres or more total land area - ANS-5
Drainage Area for Temporary Sediment Trap - ANS-Maximum 5 acres
Initial storage capacity 134 cubic yards per acre
Max life is 18 months
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller AnswersCOM. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $7.99. You're not tied to anything after your purchase.