100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
COMMERCIAL CONTRACTOR PRACTICE EXAM questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5-star rating $10.49   Add to cart

Exam (elaborations)

COMMERCIAL CONTRACTOR PRACTICE EXAM questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5-star rating

 8 views  0 purchase
  • Course
  • Commercial Construction
  • Institution
  • Commercial Construction

COMMERCIAL CONTRACTOR PRACTICE EXAM questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5-star rating

Preview 3 out of 30  pages

  • August 5, 2024
  • 30
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Commercial Construction
  • Commercial Construction
avatar-seller
AnswersCOM
COMMERCIAL CONTRACTOR PRACTICE EXAM
QUESTIONS
750 feet of pipe is being laid at 0.5% slope. On a topographic map that has 6 inch contour
intervals, approximately how many intervals will be depicted on the map from one end of the
pipe to the other?

A. 2 contour intervals

B. 4 contour intervals

C. 6 contour intervals

D. 8 contour intervals - ANS-D.8 contour intervals

A 140-foot wide paved area is to be sloped 1/8 inch per foot. The elevation at the highest point
is to be 87.2 feet at the center. What is the elevation at the lowest point at the perimeter?

A. 78.70 feet

B. 81.30 feet

C. 85.74 feet

D. 86.50 feet - ANS-D.86.50 feet.

A building has an area of 3,350 square feet and a roof slope of 3 in 12. The roof is to be
covered with composite shingles at three bundles per square which can be purchased only by
the whole bundle. To convert from plan area to actual roof area, use the following table: SLOPE
MULTIPLY PLAN AREA BY 2 in 12 1. in 12 1. in 12 1. in 12 1. in 12
1. in 12 1. in 12 1. in 12 1.414 How many bundles of shingles are
REQUIRED to roof the building? Do NOT make an allowance for waste, hips, valleys or starter
courses.

A. Less than 100.

B. Between 100 and 105.

C. Between 106 and 110.

D. More than 110. - ANS-B.Between 100 and 105

,A concrete block foundation wall that is adequately braced should be cured for a MINIMUM of
how much time before backfilling?

A.24 hours

B. 48 hours

C. 3 days

D. 7 days - ANS-B.48 hours.

A concrete masonry foundation wall extends below grade and will require parge coating using
Portland cement mortar. What is the minimum allowable thickness?

A. 1/4 inch

B. 3/8 inch

C. 1/2 inch

D. 5/8 inch - ANS-B.3/8 inch

A contract refers to an insurance agreement that the contractor is required to have. This is
considered to be which of the following?

A. a bond

B. an addendum

C. part of the contract

D. a non-binding agreement - ANS-C.part of the contract

A contractor should do all of the following when estimating a project EXCEPT

A. identify the risks.

B. predict the likelihood of an unwanted outcome.

C. place a dollar amount on it.

D. assume ideal conditions. - ANS-D.assume ideal conditions.

, A cost plus contract calls for the contractor to receive direct costs for labor and materials, and a
markup of 20% of direct costs. The contractor is also to receive a bonus of 15% of savings if
total cost to the owner is less than $80,000, and a bonus of $1,000 per day if the project is
completed early. Final costs for direct labor and materials are $60,000. The project is completed
3 days early. What is the total amount due the contractor?

A. Less than $70,000.

B. Between $70,000 and $75,000.

C. Between $75,001 and $80,000.

D. More than $80,000. - ANS-C.Between $75,001 and $80,000.

A driveway rises 18 feet in a horizontal distance of 190 feet. What is the percent grade?

A. 1%

B. 9%

C. 18%

D. 34% - ANS-B.9%

A foundation drain shall extend past the outside edge of the footing at least how far?

A. 4 inches

B. 8 inches

C. 12 inches

D. 16 inches - ANS-C.12 inches

A lump sum contract on a project has a total contract price of $160,000. Retainage has been
held back at 10%. The contractor has received progress payments for 75% of the project. The
contractor submits a request for final payment for the now completed project. How much should
the final payment amount be?

A. less than $30,000

B. between $30,000 and $40,000

C. between $40,001 and $50,000

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller AnswersCOM. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79650 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart