100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NICET LEVEL 2 FULL EXAM |COMPLETE QUESTIONS AND CORRECT ANSWERS |A RATED. $30.49   Add to cart

Exam (elaborations)

NICET LEVEL 2 FULL EXAM |COMPLETE QUESTIONS AND CORRECT ANSWERS |A RATED.

 5 views  0 purchase
  • Course
  • NICET LEVEL 2
  • Institution
  • NICET LEVEL 2

NICET LEVEL 2 FULL EXAM |COMPLETE QUESTIONS AND CORRECT ANSWERS |A RATED. NICET LEVEL 2 FULL EXAM |COMPLETE QUESTIONS AND CORRECT ANSWERS |A RATED. NICET LEVEL 2 FULL EXAM |COMPLETE QUESTIONS AND CORRECT ANSWERS |A RATED. NICET LEVEL 2 FULL EXAM |COMPLETE QUESTIONS AND CORRECT ...

[Show more]

Preview 4 out of 72  pages

  • August 6, 2024
  • 72
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NICET LEVEL 2
  • NICET LEVEL 2
avatar-seller
nyagajoseph539
NICET LEVEL 2 FULL EXAM |COMPLETE QUESTIONS AND
CORRECT ANSWERS |A RATED.


You are inspecting a construction site and notice that the soil appears
to be a fine-grained, cohesive material with good bearing capacity.
What type of soil is this likely to be? a.
Clay
b. Sand
c. Gravel
d. Loam - ANSWER -a. Clay


You are inspecting the clearing and grubbing of a construction site
and notice that a large tree has been removed within the limits of
disturbance. What should you do?
a. Notify the project manager and request that a replacement tree be
planted
b. Document the removal in the construction logs and move on
c. Issue a stop work order until a replacement tree can be planted
d. Request that the tree be replaced, but do not issue a stop work
order - ANSWER -d. Request that the tree be replaced, but do not
issue a stop work order


You are inspecting the placement of an embankment and notice that
the compaction is below the required specification. What should you
do?
a. Accept the work and move on

,b. Notify the project manager and request that the compaction be
corrected
c. Issue a stop work order until the compaction can be corrected
d. Document the issue in the construction logs and move on -
ANSWER -b. Notify the project manager and request that the
compaction be corrected


You are asked to calculate the excavation and embankment quantities
for a construction project. What information do you need to complete
this task?
a. The dimensions of the excavation and embankment areas
b. The weight of the soil and other materials
c. The density of the soil and other materials
d. All of the above - ANSWER -d. All of the above


You are inspecting a construction site and notice that temporary
erosion and sediment controls are not properly installed. What should
you do?
a. Accept the work and move on
b. Notify the project manager and request that the controls be
corrected
c. Issue a stop work order until the controls can be corrected
d. Document the issue in the construction logs and move on -
ANSWER -c. Issue a stop work order until the controls can be
corrected

,You are inspecting the placement of a subgrade and notice that the
undercutting is not to the specified depth. What should you do? a.
Accept the work and move on
b. Notify the project manager and request that the undercutting be
corrected
c. Issue a stop work order until the undercutting can be corrected
d. Document the issue in the construction logs and move on -
ANSWER -b. Notify the project manager and request that the
undercutting be corrected


You are asked to determine the acceptability of the results of a soil
compaction test. What criteria should you use to make this
determination?
a. The compaction meets or exceeds the specified density
b. The compaction meets or exceeds the specified moisture content
c. The compaction meets or exceeds both the specified density and
moisture content
d. The compaction meets or exceeds the specified density or
moisture content - ANSWER -c. The compaction meets or exceeds
both the specified density and moisture content


You are inspecting the placement of an aggregate subbase and notice
that the finish tolerances are not being met. What should you do? a.
Accept the work and move on
b. Notify the project manager and request that the finish tolerances be
corrected
c. Issue a stop work order until the finish tolerances can be corrected

, d. Document the issue in the construction logs and move on -
ANSWER -b. Notify the project manager and request that the finish
tolerances be corrected


You are asked to identify the limits of disturbance on a construction
site. What are the limits of disturbance?
a. The area where trees, shrubs, and other vegetation will be removed
or damaged during construction
b. The area where the construction activities will take place
c. The area where the construction activities will have an impact on
the environment
d. All of the above - ANSWER -d. All of the above


You are inspecting a construction site and notice that materials
testing and certification are not being properly carried out. What
should you do?
a. Accept the work and move on
b. Notify the project manager and request that the testing and
certification be corrected
c. Issue a stop work order until the testing and certification can be
corrected
d. Document the issue in the construction logs and move on -
ANSWER -b. Notify the project manager and request that the
testing and certification be corrected

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller nyagajoseph539. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $30.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79751 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$30.49
  • (0)
  Add to cart