The key to any successful inspection process is _________ Answer - Regular
schedules, documenting all discrepancies, and timely repair/replacement of
damaged items
What is the single most important factor in maintaining adequate cooling and
airflow to spaces? Answer - Keeping cooling coils clean
What ventilation system is second only to laundry exhaust ducts in dirt and
debris buildup? Answer - The sanitary space exhaust system
The cleaning conditions used when evaluating a ventilation system consist of
_______ Answer - Clean, light buildup, moderate buildup, heavy buildup
Some older navy ships have felt gaskets installed in ventilation system
ductwork flanges. felt gaskets may contain ____ Answer - PCBs
In spaces where welding operations are conducted, the ventilation system
must meet the minimum standards specified in _________ Answer - NSTM
Chapter 074, Vol. 1
The criteria for selecting the number of circulation fans in a space is ________
Answer - Only 1 fan is provided when the deck area is less than 300 sq. ft, and
an additional fan is provided for each additional 300 sq. ft of deck area