100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
General Maintenance BOMA Pre-Quiz(with 100- correct answers). $15.49   Add to cart

Exam (elaborations)

General Maintenance BOMA Pre-Quiz(with 100- correct answers).

 5 views  0 purchase
  • Course
  • Plant Operations BOMA
  • Institution
  • Plant Operations BOMA

General Maintenance BOMA Pre-Quiz(with 100- correct answers).

Preview 3 out of 18  pages

  • August 6, 2024
  • 18
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Plant Operations BOMA
  • Plant Operations BOMA
avatar-seller
BRAINBOOSTERS
General
Maintenance
BOMA Pre-
Quiz(with 100%
correct answers)
When starting a centrifugal pump that is part
of a manifold with no check valves. - answer
You should open the suction valve, start the
pump and open the discharge valve slowly.


A valve inserted in a water line between the
corporation stop and the water meter is
generally called. - answer Curb cock


To check sheave wear. - answer Measure
each groove angle

,Variable pitch sheaves may be used in some
cases to provide which of the following types
of speed changes - answer small


Absolute pressure is gauge - answer
Pressure plus 14.7 psi


Which of the following best describes the
basic types of sprinklers systems in a
building - answer Standard wet-type system,
Standard dry-type system,
A deluge system


Power equals - answer Force x distance
divided by time


Torches should be inspected for leakage at
the - answer Tip,
Valves,
Hose connections

, Smoke detection is usually accomplished by
using either photo-electric scanning,
ionization chambers or smoke reflection
devices? - answer True


If a coupling is not properly aligned - answer
1. Will fail quicker
2. Wear out equipment and the bearing


To protect a pump and motor against slight
misalignment, they are often connected by a.
- answer Flexible coupling


The coating on a metallic electrode: - answer
Stabilizes the arc and controls oxidation.


When severing a length of 2 inch pipe it is
prefferrable to use: - answer A pipe cutter


What is the main purpose of the emergency
electric power system? - answer Run
equipment essential to human life for safety.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller BRAINBOOSTERS. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79271 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$15.49
  • (0)
  Add to cart