where ordnance is loaded on multiple aircraft - Answer-jettison ramps
topside ordnance lockers used to store high explosive - Answer-high security locking
system
what reports are used for discrepancies before the material is placed into the
transportation system - Answer-supply discrepancy report
security risk 1, 2, urgent NARS - Answer-24 hours
after termination of the assignment or after the final interview - Answer-6 months
specially designed mechanical equipment used for assembling - Answer-OHE
to prevent theft or the loss of magazine keys - Answer-separate welded or brazed rings
otto II fuel fire - Answer-finely dispersed water fog
depleted uranium ammunition - Answer-caution radioactive metal
firemain cutoff valves should always be - Answer-locked with a locking pin in the open
position
all ammunition and explosive instruction complete list of these documents can be found
in - Answer-appendix B
after which catastrophic incident - Answer-USS Oriskany
Not an example of shipboard ordnance handling equipment - Answer-cranes
it is preformed when pre-adjustment cannot resolve the discrepancy - Answer-causative
research
two heat sensing devise operating features - Answer-rate of rise and fixed temp
each heat sensing devise in a magazine can protect - Answer-120
grenades - Answer-F
deadly force at least - Answer-6 months
sunshields - Answer-be painted white