PCI Quality Control Technician Level 1 Chapter 1- 6Study Questions Latest Update Actual Exam Questions and 100% Verified Correct Answers Guaranteed A+ $20.49   Add to cart

Exam (elaborations)

PCI Quality Control Technician Level 1 Chapter 1- 6Study Questions Latest Update Actual Exam Questions and 100% Verified Correct Answers Guaranteed A+

 1 view  0 purchase
  • Course
  • PCI Quality Control Technician Level 1
  • Institution
  • PCI Quality Control Technician Level 1

PCI Quality Control Technician Level 1 Chapter 1- 6Study Questions Latest Update Actual Exam Questions and 100% Verified Correct Answers Guaranteed A+

Preview 3 out of 20  pages

  • August 9, 2024
  • 20
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • PCI Quality Control Technician Level 1
  • PCI Quality Control Technician Level 1
avatar-seller
Tutordiligent
PCI Quality Control Technician Level 1 Chapter
1- 6Study Questions Latest Update 2024-2025
Actual Exam Questions and 100% Verified
Correct Answers Guaranteed A+
A commitment to quality starts where in the organization? - CORRECT ANSWER: The
commitment to quality begins with a company's top management.


A number of principal factors in quality control are mentioned in this chapter. Name four
of these. - CORRECT ANSWER: Principal factors in quality control include:
-Management commitment to quality
-Qualified personnel for all stages of design and production
-Testing and inspection of the various materials selected for use as well as product
storage and handling
-Clear and complete shop drawings
-Accurate testing procedures
-Control of dimensions and tolerances
-Proper position of all embedded items
-Correct size and positioning of reinforcing steel
Proper handling, placing, and consolidation of concrete
Proper proportioning and adequate mixing of concrete
-Appropriate and controlled curing
-Proper procedure for de-tensioning and striping
-Proper handling, storing, ransporting, and erecting of members
-Complete and accurate production documentation


A plant producing architectural concrete products must have:
a. At least one Level III technician
b. At least one level I and one level II technician
c. at least one Level II technician

,d. at least one Level I technician - CORRECT ANSWER: D. At least a level 1 Technician


Each plant should have a written QA program. What is this program called and what are
the minimum items to be addressed by it. - CORRECT ANSWER: Minimum items to be
addressed by the QSM are:
-Management commitment
-Definition of organization structure
-Management review of the QA program
-Plant facilities layout and definition
-Purchasing procedures for QC compliance
-Uniform methods for reporting, reviewing, and maintaining records
-identification of training needs
-Control, calibration, and paintenance of necessary equipment
-Standards for shop drawings to ensure accuracy and uniform interpretation of
instructions for manufacturing handling
-Procedures for review and dissemination of project-specific requirements to production
and quality control personell.


Inspection and recordkeeping should cover many areas in production. List four of the
areas mentioned in this chapter. - CORRECT ANSWER: Inspection and record keeping
should cover the following areas:
-identification, examination, acceptance, and plant testing of materials and
subassemblies
-Inspecting and recording of tensioning
-Inspection of beds and forms prior to concreting
-Checking of dimensions of members, numbers, size, and positions of tendons,
reinforcing steel, other incorporated materials, openings, blockouts, and the like
-Regular inspection of batching mixing, conveying, placing, compacting, finishing, and
curing concrete
-Preparation of concrete specimens for strength testing and performance of concrete
tests

, -Inspecting operations of detensioning, product removal from beds, handling, and
storing
-Preparation of concrete specimens for strength testing and performance of concrete
tests
-Final inspection of finished product prior to shipment. Monitoring dimensions, camber,
blockouts, embedments, and finishes
-General observation of plant equipment, working conditions, weather, and other items
that have the potential for affecting the products
-Products purchased from suppliers shall comply with requirements for in-plant
prodcution as outlined in PCI's quality control manuals MNL-116 & 117
-To establish evidence of proper manufactureing and monitoring as outlined, a system
of records shall be utilized in each plant for the procedures outlined


Post-pour inspection covers many areas that need to be checked. Name three from this
chapter. - CORRECT ANSWER: Post-pour inspections should include
-Product identification
-Visual inspection of product
-Product dimensional verification
-Strand slippage
-Camber
-Product storage
-Product finish


Production personnel may be involved in quality control activities in practices where
they were directly involved - true or false? - CORRECT ANSWER: False


Project samples should be used for what project conditions? - CORRECT ANSWER:
Project samples should be used when required by the project specifications and when
special finishes are involved.


The flag shown on the weld symbol indicates what? - CORRECT ANSWER: Field Weld

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Tutordiligent. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $20.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78310 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$20.49
  • (0)
  Add to cart