In construction, what establishes quality requirements? - The Design
What is the purpose of CQM? - assure that the quality set by the plans and specifications is achieved
Define CQM - The performance of tasks, which ensure that construction is performed according to plans
and specifications, on time, within a defined budget, and a safe work environment
What are the two principle areas of CQM activity? -
What are the benefits of CQM to the contractor?To the Government? - Enables contractor and
Government personnel to be proactive and, thereby, prevent mishaps and deficiencies from occurring
What two factors have caused the construction industry to become highly specialized? - Increased
technology and regulation
Why are construction projects difficult to manage? - Construction projects are unique by nature, making
standardization difficult
• Construction operations involve many skills that are nonrepetitive and do not lend themselves to an
assembly line approach
• Construction projects are, to a large degree, dependent upon environmental conditions which are
beyond the contractor's control
• Subject to varied regulations from numerous government agencies
What factors will influence both the Government and the construction industry in the future? -
, What is difference between inspection and control? - Control is a system of future planning. Inspection
is inspecting ongoing or completed work
Is the following statement True or False: "CQC is principally concerned with inspection?" Explain. -
How does the contractor benefit from effective CQC? - reduce the largest unnecessary cost to the
contractor--the tear out and replacement cost stemming from deficient workmanship and materials
Who has contractual responsibility for quality control? - Contractor
Name the benefits of effective CQC that accrue to the Government? - earlier completion, reduced field
overhead costs, and the ability to do a greater volume of business
What is the role and responsibility of the contractor in CQC? -
What are the responsibilities of the contractor's QC Manager? -
What are the QA responsibilities of the Government? -
Name the items upon which partnering relationships are based. -
Name three instances of contractor extensions of designs. -
Name some possible areas that must be addressed during the contractor's coordination review of the
contract plans and specifications in a designbid-build contract. -
What are the responsibilities of the QC Manager during the design phase of a design-build project and
what must the Design Quality Control Plan include? -
In a design-build contract when should an RFI be used, when should a DVCR be used? -
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper VasilyKichigin. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor $13.48. Je zit daarna nergens aan vast.