1. The method of computation of Contractor's overhead and profits for Change
Order prices, where both additions and deletions are involved, is found in the:
a) Agreement.
b) Conditions of the Contract.
c) Division 01.
d) Instructions to Bidders. Right Ans - b) Conditions of the Contract.
2. General Requirements are part of:
a) Supplementary Conditions.
b) Bidding Requirements.
c) Specifications.
d) Summary of Work. Right Ans - c) Specifications.
3. The three essential considerations in the evaluation of a product are:
a) Requirements, Criteria, and Tests.
b) Costs, Maintenance, and Installation.
c) Life Cycle Cost, Installation Cost, and Maintenance Cost.
d) Case studies, Failures, and Problems. Right Ans - a) Requirements,
Criteria, and Tests.
4. Whose responsibility is it to furnish the Shop Drawings?
a) The Architect/Engineer
b) The Contractor
c) The Owner
d) The Subcontractor Right Ans - b) The Contractor
5. The division of the Work among multiple prime Contracts is described in:
a) Instructions to Bidders.
b) Supplementary Conditions.
c) Division 01.
d) Special Conditions. Right Ans - c) Division 01.
6. During the Project Conception Stage, the A/E may be retained to:
a) Develop outline specifications
b) Describe the character of the mechanical system
,c) Prepare renderings
d) Assist in financial feasibility studies Right Ans - d) Assist in financial
feasibility studies
7. What is the main purpose of MasterFormat?
a) for scheduling, value management, recording of design data and managing
costs.
b) used during the planning stage of a project.
c) to organize the Project Manual, reference keynotes and detailed cost
estimates.
d) when there is a standardized need for information to appear upon each
page of a project manual. Right Ans - c) to organize the Project Manual,
reference keynotes and detailed cost estimates.
8. The person who becomes secondarily liable for another's debt or
performance is called the:
a) Guarantee
b) Warrantor
c) Guarantor
d) Warrantee Right Ans - c) Guarantor
9. Integrated projects are distinguished by all of the following characteristics
except:
a) Development of virtual project model through input from a collaborative
team
b) Trust-based collaboration between project team members
c) Maximized efficiency through design, fabrication, and construction
d) "Just as needed" team involvement to reduce owner's pre-construction
expenses Right Ans - d) "Just as needed" team involvement to reduce
owner's pre-construction expenses
10. Outline Specifications are written for
a) only Divisions 02-14 where actual products are discussed
b) Divisions 01-49
c) only Divisions 01-14 (excluding mechanical and electrical)
d) the exclusive use of the A/E Right Ans - b) Divisions 01-49
11. An example of a MasterFormat Level 3 specification Section is:
a) 05 00 00 Metals.
, b) 05 20 00 Metal Joists.
c) 05 21 00 Steel Joist Framing.
d) 05 21 19 Open Web Steel Joist Framing. Right Ans - d) 05 21 19 Open
Web Steel Joist Framing.
12. What activities take place in the Project Conception Stage?
a) The engineers develop the mechanical and electrical systems.
b) The site is selected and the demolition is done.
c) Feasibility studies and budget is set.
d) The program is evaluated and the engineers are selected. Right Ans - c)
Feasibility studies and budget is set.
13. The document recommended to organize preliminary construction
information into a standard order on the basis of systems and assemblies is:
a) MasterFormat
b) Uniformat
c) Outline Specifications
d) Project Manual Right Ans - b) Uniformat
14. All design and construction drawings can be classified as one of two types
of views:
a) Numeric and graphic.
b) Vertical and horizontal.
c) Scaled and nonscaled.
d) Exterior and interior. Right Ans - c) Scaled and nonscaled.
15. Substitution requirements and procedures during bidding
a) Are not allowed under most public bidding statutes.
b) Are modified by the Supplementary Conditions.
c) Are stated in the Instructions to Bidders.
d) Are provided by requests by telephone. Right Ans - c) Are stated in the
Instructions to Bidders.
16. Submittal requirements for Mechanical and Electrical work are specified
in:
a) General Conditions
b) Supplementary Conditions
c) Division 01
d) Division 22 and 26 Right Ans - c) Division 01
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Studyhall. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $17.99. You're not tied to anything after your purchase.