100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CMIT CERTIFICATION EXAM 2024 ACTUAL EXAM COMPLETE 200 QUESTIONS WITH DETAILED VERIFIED ANSWERS (100% CORRECT VERIFIED ANSWERS) ALREADY GRADED A+ $24.99   Add to cart

Exam (elaborations)

CMIT CERTIFICATION EXAM 2024 ACTUAL EXAM COMPLETE 200 QUESTIONS WITH DETAILED VERIFIED ANSWERS (100% CORRECT VERIFIED ANSWERS) ALREADY GRADED A+

 14 views  0 purchase
  • Course
  • CMIT CERTIFICATION
  • Institution
  • CMIT CERTIFICATION

CMIT CERTIFICATION EXAM 2024 ACTUAL EXAM COMPLETE 200 QUESTIONS WITH DETAILED VERIFIED ANSWERS (100% CORRECT VERIFIED ANSWERS) ALREADY GRADED A+

Preview 4 out of 50  pages

  • August 11, 2024
  • 50
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CMIT CERTIFICATION
  • CMIT CERTIFICATION
avatar-seller
keithdaniel
1|Page


CMIT CERTIFICATION EXAM 2024 ACTUAL EXAM
COMPLETE 200 QUESTIONS WITH DETAILED VERIFIED
ANSWERS (100% CORRECT VERIFIED ANSWERS) ALREADY
GRADED A+




1. A CM's role and responsibilities are governed solely by
the Owner/CM Agreement.
True False - CORRECT ANSWER >>>>Answer: (TRUE)

2. There are two basic forms of CM, agency and at-risk.
Each form provides for the basic services of construction
management practice. However, there are some key
differences. Which of the following do not apply to both
CM forms?

a. Both forms provide advice to the owner on
constructability, budget and the schedule.

,2|Page



b. Both require that the liabilities and risks assumed by
the parties be clearly understood, coordinated, and
stated in the respective contracts.
c. Both forms allow the CM to function in an advisory
role for the entire engagement of the CM.
d. Services can vary based on the contractual
relationships of the parties and the risks that are
assumed. - CORRECT ANSWER >>>>Answer: Both forms
allow the CM to function in an advisory role for the
entire engagement of the CM.

3. Construction management had its beginnings in the
early to mid-1960's. Which of the following factors
contributed to the initial use of this delivery system?

a) The need to reduce the overall time and cost
associated with project delivery.
b) The increasing cost of money and the unpredictability
of project funding streams.
c) The changing role of the general contractor and the
increasing numbers of specialty trade contractors.
d) All of the above. - CORRECT ANSWER >>>>Answer: All
of the above.

,3|Page



4. The General Services Administration was the first
federal agency to use construction management. -
CORRECT ANSWER >>>>Answer: (TRUE)

5. The General Services Administration, the Department
of Health, Education and Welfare (now HHS), and the
Veterans Administration ran into similar difficulties in the
use of construction management. Which of the following
was/were common problems for all three agencies?

a) Funding restrictions
b) Claims
c) Change conditions
d) All of the above - CORRECT ANSWER >>>>Answer: All
of the above

CMAA was formed and incorporated 1982 with its
primary focus being the growth and development of the
construction management profession. - CORRECT
ANSWER >>>>Answer: (TRUE)

7. The CMAA Construction Management Standards of
Practice is intended as a guide to the range of services
that constitute professional construction management.
They seek to meet the documented need for definitions
of what construction management services are, without

, 4|Page



unduly structuring the methodologies by which those
services are provided by the CM. - CORRECT ANSWER
>>>>Answer: (TRUE)

8. The goals of the Construction Management
Association of America (CMAA) include:

a) Setting standards and developing contract documents
for construction management practice.
b) Expanding the understanding of the construction
management concept and its use in the marketplace.
c) Advocacy for construction management in the
legislative, regulatory, and judicial arenas of federal,
state, and local governments.
d) All of the above. - CORRECT ANSWER >>>>Answer: All
the above

9. The fact that an individual is certified or licensed in any
other profession does not, per se, establish him/her as a
qualified CM.
True False - CORRECT ANSWER >>>>Answer: (True)

10. Certification as a CM means the construction
management practitioner has 'state of the art'
knowledge and capability to practice construction
management.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller keithdaniel. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $24.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

72964 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$24.99
  • (0)
  Add to cart