Interconnection reliability operations and coordination with verified solutions $17.99   In winkelwagen

Tentamen (uitwerkingen)

Interconnection reliability operations and coordination with verified solutions

 4 keer bekeken  0 keer verkocht
  • Vak
  • NERC RC certification
  • Instelling
  • NERC RC Certification

Interconnection reliability operations and coordination with verified solutions

Voorbeeld 3 van de 16  pagina's

  • 11 augustus 2024
  • 16
  • 2024/2025
  • Tentamen (uitwerkingen)
  • Vragen en antwoorden
  • NERC RC certification
  • NERC RC certification
avatar-seller
Sakayobako30
Interconnection reliability operations
and coordination

IRO - correct answer ✔✔Interconnection reliability operations



The reliability coordinator is responsible for - correct answer ✔✔the reliable operation of the bulk
electric system



IRO -001 - correct answer ✔✔authority



IRO - 003 - correct answer ✔✔Wide area view



The RC shall know the current status of all _______ in their whose failure, degradation or disconnection
could result in a system operating limit or an interconnection reliability operating limit violation - correct
answer ✔✔



Since events in one part of the system can influence operations in all other parts of the system, the RC is
required to monitor and determine any potential SOL and IROL violations - correct answer ✔✔True



Once a Reliability Coordinator issues a directive to preserve the integrity and reliability of the Bulk
Electric System, actions shall be taken without delay, but no longer than ________. - correct answer
✔✔30 minutes



Reliability Coordinator shall initiate control actions or emergency procedures to relieve the violation
without delay and no longer than ___________. - correct answer ✔✔30 minutes



___________ have the duty to continuously assess transmission reliability and coordinate emergency
operations among the operating entities within the region and across the regional boundaries. - correct
answer ✔✔Reliability Coordinators

,A portion of a Reliability Coordinator Area is experiencing low voltage, what directives should the
Reliability Coordinator give? - correct answer ✔✔Lower transfers across area and increase generation in
area with low voltage



Low voltage is a result of reactive power and losses associated with transferring power to load areas.
Increasing generation in the area with low voltage reduces losses associated with transferring power.



At any time, regardless of prior planned or unplanned events, the Reliability Coordinator should be able
to determine any potential ______________ violations within its Reliability Coordinator Area. - correct
answer ✔✔System Operating Limits (SOL) & Interconnection Reliability Operating Limits (IROL)



The _______ as defined by NERC is the electrical generation resources, transmission lines,
interconnections with neighboring systems, and associated equipment, generally operated at voltages of
100 kilovolts or higher. - correct answer ✔✔Bulk Electric System



Each Reliability Coordinator shall have adequate analysis tools, such as state estimation, contingency
analysis capabilities and ________ to monitor the Bulk Electric System. - correct answer ✔✔wide-area
overview displays



Wide-Area view is required therefore, each Reliability Coordinator shall have adequate analysis tools;
such as, state estimation, pre- and post-contingency analysis capabilities (thermal, stability, and voltage),
and wide-area overview displays.



This is stated in the NERC Standard IRO-002 explicitly and applied in the NERC Standard IRO-003 as the
RC shall monitor a wide area view within its Reliability Coordinator Area and that of neighboring
Reliability Coordinators.



Reliability Coordinators that delegate tasks to other entities shall have formal operating _________ with
each entity to which tasks are delegated. - correct answer ✔✔agreements



If Reliability Coordinator tasks are delegated to other entities, the Reliability Coordinator shall verify that
these tasks are carried out by ___________ operating personnel. - correct answer ✔✔NERC certified

, Reliability Coordinators shall have clear, comprehensive coordination agreements with adjacent
Reliability Coordinators to ensure that System Operating Limit or Interconnection Reliability Operating
Limit violation mitigation requiring actions in adjacent Reliability Coordinator Areas are __________. -
correct answer ✔✔coordinated



Once a Reliability Coordinator issues a directive to preserve the integrity and reliability of the Bulk
Electric System, actions shall be taken without delay, but no longer than ________. - correct answer
✔✔30 minutes



Reliability Coordinators will have authority to take appropriate emergency actions to mitigate and
maintain the reliable operation of the bulk power transmission system, up to and including
_______________. - correct answer ✔✔shedding load



A portion of a Reliability Coordinator Area is experiencing low voltage, what directives should the
Reliability Coordinator give? - correct answer ✔✔Lower transfers across area and increase generation in
area with low voltage



___________ have the duty to continuously assess transmission reliability and coordinate emergency
operations among the operating entities within the region and across the regional boundaries. - correct
answer ✔✔Reliability Coordinators



Which of the following are required tasks of the Reliability Coordinator for its Reliability Coordinator
Area? - correct answer ✔✔Monitor all Bulk Electric System facilities

Determine potential SOL violations

Determine potential IROL violations



The ____________ function was established to provide entities with a "big picture" view of the system. -
correct answer ✔✔Reliability Coordinator



Each Reliability Coordinator shall have adequate analysis tools, such as state estimation, contingency
analysis capabilities and ________ to monitor the Bulk Electric System. - correct answer ✔✔wide-area
overview displays

Voordelen van het kopen van samenvattingen bij Stuvia op een rij:

Verzekerd van kwaliteit door reviews

Verzekerd van kwaliteit door reviews

Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!

Snel en makkelijk kopen

Snel en makkelijk kopen

Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.

Focus op de essentie

Focus op de essentie

Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!

Veelgestelde vragen

Wat krijg ik als ik dit document koop?

Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.

Tevredenheidsgarantie: hoe werkt dat?

Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.

Van wie koop ik deze samenvatting?

Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Sakayobako30. Stuvia faciliteert de betaling aan de verkoper.

Zit ik meteen vast aan een abonnement?

Nee, je koopt alleen deze samenvatting voor $17.99. Je zit daarna nergens aan vast.

Is Stuvia te vertrouwen?

4,6 sterren op Google & Trustpilot (+1000 reviews)

Afgelopen 30 dagen zijn er 80461 samenvattingen verkocht

Opgericht in 2010, al 14 jaar dé plek om samenvattingen te kopen

Start met verkopen
$17.99
  • (0)
  Kopen