100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
INTERCONNECTION RELIABILITY OPERATIONS AND COORDINATION EXAMS WITH ACTUAL CORRECT QUESTIONS AND VERIFIED DETAILED ANSWERS ALREADY GRADED A+ GUARANTEED PASS $15.49   Add to cart

Exam (elaborations)

INTERCONNECTION RELIABILITY OPERATIONS AND COORDINATION EXAMS WITH ACTUAL CORRECT QUESTIONS AND VERIFIED DETAILED ANSWERS ALREADY GRADED A+ GUARANTEED PASS

 7 views  0 purchase
  • Course
  • INTERCONNECTION
  • Institution
  • INTERCONNECTION

INTERCONNECTION RELIABILITY OPERATIONS AND COORDINATION EXAMS WITH ACTUAL CORRECT QUESTIONS AND VERIFIED DETAILED ANSWERS ALREADY GRADED A+ GUARANTEED PASS

Preview 2 out of 14  pages

  • August 11, 2024
  • 14
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • interconnection
  • INTERCONNECTION
  • INTERCONNECTION
avatar-seller
drjulie
INTERCONNECTION RELIABILITY
OPERATIONS AND COORDINATION
EXAMS WITH ACTUAL CORRECT
QUESTIONS AND VERIFIED
DETAILED ANSWERS ALREADY
GRADED A+ GUARANTEED PASS



The RC shall know the current status of all _______ in their whose failure, degradation or disconnection
could result in a system operating limit or an interconnection reliability operating limit violation

Since events in one part of the system can influence operations in all other parts of the system, the RC is
required to monitor and determine any potential SOL and IROL violations

True

Once a Reliability Coordinator issues a directive to preserve the integrity and reliability of the Bulk
Electric System, actions shall be taken without delay, but no longer than ________.

30 minutes

Reliability Coordinator shall initiate control actions or emergency procedures to relieve the violation
without delay and no longer than ___________.

30 minutes

___________ have the duty to continuously assess transmission reliability and coordinate emergency
operations among the operating entities within the region and across the regional boundaries.

Reliability Coordinators

, A portion of a Reliability Coordinator Area is experiencing low voltage, what directives should the
Reliability Coordinator give?

Lower transfers across area and increase generation in area with low voltage

Low voltage is a result of reactive power and losses associated with transferring power to load areas.
Increasing generation in the area with low voltage reduces losses associated with transferring power.

At any time, regardless of prior planned or unplanned events, the Reliability Coordinator should be able
to determine any potential ______________ violations within its Reliability Coordinator Area.

System Operating Limits (SOL) & Interconnection Reliability Operating Limits (IROL)

The _______ as defined by NERC is the electrical generation resources, transmission lines,
interconnections with neighboring systems, and associated equipment, generally operated at voltages
of 100 kilovolts or higher.

Bulk Electric System

Each Reliability Coordinator shall have adequate analysis tools, such as state estimation, contingency
analysis capabilities and ________ to monitor the Bulk Electric System.

wide-area overview displays

Wide-Area view is required therefore, each Reliability Coordinator shall have adequate analysis tools;
such as, state estimation, pre- and post-contingency analysis capabilities (thermal, stability, and
voltage), and wide-area overview displays.

This is stated in the NERC Standard IRO-002 explicitly and applied in the NERC Standard IRO-003 as the
RC shall monitor a wide area view within its Reliability Coordinator Area and that of neighboring
Reliability Coordinators.

Reliability Coordinators that delegate tasks to other entities shall have formal operating _________ with
each entity to which tasks are delegated.

agreements

If Reliability Coordinator tasks are delegated to other entities, the Reliability Coordinator shall verify that
these tasks are carried out by ___________ operating personnel.

NERC certified

Reliability Coordinators shall have clear, comprehensive coordination agreements with adjacent
Reliability Coordinators to ensure that System Operating Limit or Interconnection Reliability Operating
Limit violation mitigation requiring actions in adjacent Reliability Coordinator Areas are __________.

coordinated

Once a Reliability Coordinator issues a directive to preserve the integrity and reliability of the Bulk
Electric System, actions shall be taken without delay, but no longer than ________.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller drjulie. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78834 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$15.49
  • (0)
  Add to cart