100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Michigan Builders License Exam Questions With 100%Verified Answers A+GRADED $10.98   Add to cart

Exam (elaborations)

Michigan Builders License Exam Questions With 100%Verified Answers A+GRADED

 13 views  0 purchase
  • Course
  • Michigan builders license
  • Institution
  • Michigan Builders License

Michigan Builders License Exam Questions With 100%Verified Answers A+GRADED Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. - correct answer...IRC (International Residential C...

[Show more]

Preview 4 out of 56  pages

  • August 12, 2024
  • 56
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Michigan builders license
  • Michigan builders license
avatar-seller
agradesolutions
Michigan Builders License Exam
Questions With 100%Verified Answers
A+GRADED
Created to serve as a complete, comprehensive code regulating the construction of
single-family, two-family and buildings consisting of three or more townhouse units. -
correct answer...✔✔IRC (International Residential Code)

Administrative - correct answer...✔✔First 2 chapters of code book are

True - correct answer...✔✔Plans or supporting documents are almost always required
by the controlling authority prior to issuing a permit. T or F

Yes - correct answer...✔✔Does the building official have the authority to render
interpretations of the code?

8 foot fence. - correct answer...✔✔None of the following require a permit, EXCEPT:
sidewalks and driveways
tiling
an 8 foot fence
playground equipment

False - correct answer...✔✔Tables and illustrations are always supported by
information found in the written code and footnotes. T or F

Live load. - correct answer...✔✔The amount of evenly distributed weight imposed by
inhabitants, goods and removable objects on a floor or roof system is referred to as

True. - correct answer...✔✔If a code requirement is in the book, it is both acceptable
and enforceable by the code official. T or F

Figures. - correct answer...✔✔Illustrations are typically referred to as

Determine that buildings are built to the minimum enforceable standard. - correct
answer...✔✔Generally speaking, the building official's job is to

True. - correct answer...✔✔It is required that all manufacturer instructions be at the
jobsite at the time of inspection. T or F

Kitchen. - correct answer...✔✔All of the following are not considered habitable spaces
EXCEPT:


AGRADESOLUTIONS

,bathrooms
kitchens
storage spaces
closets

3. - correct answer...✔✔Bathrooms must be provided with an aggregate glazing area
no less than _____ square feet, half of which must be openable.

44 inches. - correct answer...✔✔The maximum height of an egress window above the
floor is

5.7 sq ft. - correct answer...✔✔A basement bedroom must have an egress window with
a clear opening of at least ______ square feet.

3. - correct answer...✔✔At least one side-hinged exit door must be in each dwelling
unit, and must be _____ feet wide.

30 inches. - correct answer...✔✔A porch more than _____ inches above grade must be
provided with 36" guards.

200. - correct answer...✔✔Wall and ceiling finishes shall have a flame-spread
classification of no more than ______ .

7 days. - correct answer...✔✔According to code, concrete must reach at least 70% of
it's ability within ____________days.

40%. - correct answer...✔✔A stud used for a non-bearing partitions may not be
notched more than ____% of the stud width.

Additions, alterations, renovation and repairs. - correct answer...✔✔The Michigan
Uniform Energy code applies to new buildings as well as

U-factor. - correct answer...✔✔___________ is a measure of how well the window or
door assembly conducts heat. The lower the number, the better insulation the assembly
will provide.

50%. - correct answer...✔✔Energy losses from recessed lighting fixtures can often
reach ___% of the total thermal loss of a ceiling.

R-3. - correct answer...✔✔Michigan requires a minimum thermal resistance of
____________for mechanical system piping.

True. - correct answer...✔✔Oversized HVAC equipment has a higher initial cost, a
higher operating cost, provides less comfort, and shorter life expectancy. T or F



AGRADESOLUTIONS

,Prescriptive Path. - correct answer...✔✔_______ is the compliance route that applies
Table 402.1.1 to building envelope components, and is considered the most simple.

Area weighted averages. - correct answer...✔✔___________ can be used to satisfy U-
factor and SHGC requirements.

IC (Insulation Contact) - correct answer...✔✔Recessed lights must be _____ rated.

True. - correct answer...✔✔Up to 15 square feet of glazing per dwelling unit is
exempted from U-value requirements. T or F

Registered design professional. - correct answer...✔✔The 2009 IECC requires a
permanent certificate posted on the electrical distribution panel. The certificate shall be
completed by the builder or

State energy code requirements. - correct answer...✔✔One hurdle contractors face
when bidding for an energy efficient project is choosing materials that fit the design, and
also meet

False. - correct answer...✔✔Historically significant buildings are not exempt from code
changes. T or F

R-value
Settled thickness
Manufacturer name - correct answer...✔✔Insulation products (blown and sprayed)
must be documented with:

March 2011. - correct answer...✔✔The new Michigan codes took effect in

10. - correct answer...✔✔Below grade walls are insulated from the top of the basement
wall down to _____ below grade, or the basement floor, whichever is less.

Area weighted average. - correct answer...✔✔The _______ is the combined Solar
Heat Gain Coefficient of all the glazed fenestration products in the building.

Thermal insulation R-values
Design criteria
Equipment systems - correct answer...✔✔Plans and specifications must be detailed in
regards to:

2009. - correct answer...✔✔In Michigan, the residential energy code is based on the
_____ IECC, with certain amendments.

Air leakage. - correct answer...✔✔___________ is the rate of air infiltration in the
presence of a specific pressure differential.


AGRADESOLUTIONS

, Windows
Attic access hatches
Recessed lights - correct answer...✔✔Air leakage is the random movement of air into
and out of ________ through cracks and holes.

Table 402.1.1
2009 IECC - correct answer...✔✔R-values for insulation and fenestration requirements
by component can be found in

International Energy Conservation Code - correct answer...✔✔IECC

U-factor and UA alternatives. - correct answer...✔✔The _____________ compliance
method allows for more innovative construction techniques like SIPs or Advanced
Framing.

500 sq feet - correct answer...✔✔R-30 is permitted in vaulted ceilings, but is limited to

True. - correct answer...✔✔Floor insulation must be installed to maintain permanent
and continuous contact with the underside of the subfloor decking. T or F

5, 6 and 7. - correct answer...✔✔Michigan falls into climate zones

False. - correct answer...✔✔It is permissible for supply ducts to be run through the
framing cavities of a residential building. T or F

IC rated (Insulation Contact) - correct answer...✔✔__________ means an electrical
fixture has been tested and listed as suitable for installation in a cavity where the fixture
may come in contact with insulation.

3%. - correct answer...✔✔According to the Dept. of Energy, improved energy codes
could reduce CO2 emissions by

300 sq ft. - correct answer...✔✔Attic insulation markers must be installed every _____
square feet.

True. - correct answer...✔✔Buildings that are exempted from the new regulations are
those with very low energy use or ones that are neither heated or cooled. T or F

Yes. - correct answer...✔✔A contractor needs to remove a non-load bearing wall, does
he need to pull a permit?

No. - correct answer...✔✔A concrete contractor has been hired by an owner to install a
driveway and sidewalks. The lot is flat and the concrete is being place on undisturbed
earth with a prepared base. Does the contractor need to pull a permit?


AGRADESOLUTIONS

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller agradesolutions. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.98. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79650 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.98
  • (0)
  Add to cart