100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
DMC 2024-25 Exam Latest Update $9.99   Add to cart

Exam (elaborations)

DMC 2024-25 Exam Latest Update

 2 views  0 purchase
  • Course
  • DMC
  • Institution
  • DMC

DMC 2024-25 Exam Latest Update ...

Preview 3 out of 17  pages

  • August 12, 2024
  • 17
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • DMC
  • DMC
avatar-seller
Zayla
DMC 2024-25 Exam Latest Update
All Geodetic Engineering surveys shall be conducted using ______ - Answer survey
grade GNSS receivers

(Geodetic Control Survey)

Project area selected shall be based on the recommendation of the__________concerned
- Answer Regional Executive Director (RED)

(Geodetic Control Survey)

Survey Order as defined in Section 15 of DAO No. 2007-29 shall be issued by the -
Answer NAMRIA Administrator

A copy of the ________ shall be transmitted to the contractor and shall signal the start of
survey activities - Answer Contract with the Notice to Proceed

The date when the contractor received the said documents shall serve as the official
date of - Answer Commencement of the Project

(Geodetic Control Survey Party 3 Basic Components)

a.) ________ for general supervision, coordination activities, administrative and other
related matters. - Answer Project Main Office

Chief of Party shall be a - Answer licensed Geodetic Engineer

(Geodetic Control Survey Party 3 Basic Components)

b.) _______ for data research, computations, cartographic, and other related activities -
Answer Office Operations

Manpower shall include computer literate personnel with knowledge on - Answer GNSS
processing software.

(Geodetic Control Survey Party 3 Basic Components)

c.) _____ for reconnaissance, monument setting, observations, and other related
activities. - Answer Field Operations

Field Operations are composed of - Answer 1) Survey Control Team

2) Reconnaissance and Monument Recovery Team

3) Monument Setting Team

All personnel in the three components mentioned (Geodetic Control Survey) shall be
listed in the proposed - Answer Geodetic Control Work Plan

,The Geodetic Control Work Plan shall be composed of - Answer Project Management
and Technical Plans

The Work Plan with the aforementioned documents together with the sketch plan of the
project site shall be forwarded to the ______ for approval before the commencement of
the project - Answer NAMRIA

The approved Work Plan shall form part of the - Answer Survey Returns

Composed of:

1.) Geodetic Control Survey Party

2.) Financial Plan

3.) Equipment complement for the project and their corresponding allocation in the
different phases of work, both in the office and in the field.

4.) The estimated duration of the project expressed in number of days as per component
project activities shall be presented in an Activity Graph, Time and Motion Diagram,
PERT-CPM, etc. - Answer Project Management Plan

Composed of:

1.) NAMRIA Topographic Map of the area (used as Base Map)

2.) Estimated number of control points to be established

3.) Proposed leveling measurement activities (if NAMRIA has no available data of the
area) - Answer Technical Plan

Using available NAMRIA Topographic Map of the area, the estimated boundary sketch of
the project site shall be plotted on appropriate scale. This shall be used as the _________
for the Geodetic Network Design. - Answer base map

The individual status of reference points of previously established Geodetic Control and
Project Control Network adjacent to or within the project area shall be _______,_______
and ________ - Answer researched, evaluated and verified

The corresponding _______ both in the Local and in the Philippine Plane Coordinate
System (PPCS), of the reference point shall be determined - Answer Geographic
Position and Plane Coordinates (GPPC)

The network design shall be composed of ________ control points and shall serve as
guide in the conduct of actual ground survey. - Answer recovered/new

the conduct of survey shall start from an established _________ and shall end at another
________(check base) - Answer PRS 92 control point, PRS 92 control point

Baseline Length for the Primary Geodetic Network (First and Second Order) in

, accordance with the nominal space - Answer 1st Order - 50 kilometers

2nd Order - 25 kilometers

Secondary Geodetic Network (3rd and 4th Order) Baseline Length - Answer 3rd Order -
5 kilometers

4th Order - variable (each Barangay shall have at least a pair of Control Points not more
than 2 kilometers apart)

The inter-visibility of stations are ________ in order to have a good Network Geometry in
the GNSS observations - Answer not necessary

In the preparation of the Network Design, it is necessary that the points selected can be
________, located in a __________ and ____________ - Answer 1.) occupied,

2.) located in a stable ground and

3.) shall not be affected by any construction activities in the near future

(Network Design Condition)

The lines connecting the control points within the network should create ________ with
the __________, such as triangles that will create a rigid network. - Answer closed
polygon,

minimum number of sides

(Network Design Condition)

The Network shall be designed so that all stations or points included therein have at
least ________ known PRS 92 control points. - Answer three (3)

____________ of the area shall be conducted to determine if there are control points that
need to be transferred from their proposed sites to strengthen weak geometric figures -
Answer Reconnaissance

The position of reference points shall be defined and marked on the ground by
monuments of ______ in the form of a ______ - Answer permanent nature;

square base frustum



(Network Design Condition)



The designed Network should have an adequate amount of ________, or additional
measurement over and beyond the absolute minimum required considering that the
main objective is to have a required precision of the control point's final coordinates. As

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Zayla. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82388 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart