UA Local 469 Foreman Certification Practice Test 2024/2025 127 Questions with 100% Correct Answers
20 views 1 purchase
Course
UA Local 469 Foreman Certification
Institution
UA Local 469 Foreman Certification
UA Local 469 Foreman Certification Practice Test 2024/2025 127 Questions with 100% Correct Answers
If a foreman from a different trade approaches you claiming that one of your crew members has been injured while working outside of his scope of work, what would be the FIRST action you should take? ...
UA Local 469 Foreman Certification Practice Test
2024/2025 127 Questions with 100% Correct
Answers
If a foreman from a different trade approaches you claiming that one of your crew members has
been injured while working outside of his scope of work, what would be the FIRST action you should
take? - Correct Answer Get the crew member medical attention.
Which of the following is a true statement with respect to a foreman 's responsibility related to his or
her crew? - Correct Answer The foreman is responsible for anything that occurs at the jobsite from
the beginning of the work day/shift to the end of the work day/shift.
Why is preparation so important in a negotiation? - Correct Answer Having time to prepare and
having a plan makes it easier to keep emotions in check.
The piping specifications required all wall penetrations to have a steel pipe sleeve.The steam piping
size is 4 inches SCH 80 carbon steel with 1 inch of fiberglass insulation. What diameter of SCH 40
carbon steel sleeve is the minimum that you can use? - Correct Answer 8 inches
A member of your crew is being excessively loud and using inappropriate language. As a foreman,
what is the MOST effective course of action to take? - Correct Answer Explain to them that their
behavior is inappropriate and may be considered harassment by fellow crew members and by
management
What is the purpose of a separation notice? - Correct Answer The purpose of a separation notice is to
identify the circumstances surrounding a termination.
With which of the following costs should a foreman be MOST concerned? - Correct Answer Labor
A(n) ________________ occurs when any condition or document modifies the work as defined in the
contract documents during the bidding process. - Correct Answer Change Order
On a project that requires 100% tie-off for elevated work, how many lanyards are required on a full
body harness? - Correct Answer 2
, The client is not happy with part of the project and wants to make a change. What actions should
you take to ensure the client is happy while ensuring that progress on your job continues? - Correct
Answer Stop working on that portion of the job that is at issue and contact your supervisor.
Using drawing, what is the elevation of the top of the 24 x 18 duct? - Correct Answer 31 feet and 10
inches.
On the project blueprint there is a bank of four pipe runs with each pipe measuring three inches in
diameter which measure 12 inches in length on the blueprint. The scale used on the blueprint is 1/4
inch equals 1 foot. How many feet of 3 inch pipe should be ordered to complete the runs? - Correct
Answer 192 feet
Using the formula below, what is the correct 45 offset when you have a rolling offset where the roll is
8 inches and the rise is 6 inches? Formula: Offset = roll 2 + rise2 - Correct Answer 10 inches.
What is the first rule of negotiation? - Correct Answer Understand the other person's needs.
Assume that you need to purchase 1,000 feet of pipe for your assigned project. If pipe costs $1.25
per foot, what is the cost of purchasing 40% of the total pipe needed? - Correct Answer $500
Which of the following describes the purpose of "Short Interval Planning? " or "Look Ahead
Planning"? - Correct Answer Breaking the job into small manageable pieces.
Which of the following correctly identifies what is included in legitimate labor costs? - Correct
Answer Hourly wages, fringe benefit packages, payroll taxes, insurance and safety costs,and small
tools and consumables.
Calculate the number of hangers needed to support 275 feet of pipe if you need a hanger placed
every 8 feet? - Correct Answer 35 hangers
The bid documents associated with your project state, "Do not remove or disturb any asbestos
containing material (ACM). " You have three days before a planned outage/shutdown to remove a
12-inch insulated gate valve that you suspect has an asbestos covering. What should you do? -
Correct Answer Contact your supervisor for proper procedures and instructions on how you should
proceed.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Winfred. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $9.99. You're not tied to anything after your purchase.