A contractor wants to raise the car speed from 100 fpm to 125 fpm, it currently has a 12" sheave. What is required? - Answer: 100 fpm/125 fpm= 12"/ X =15 A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What should you do? - Answer: Replace it with a larger MOV - 630 On a Ward-Leonard circuit the brake is set, but the motor is trying to slip through the brake. What is the issue? - Answer: Suicide Circuit - 425 You have an old DC motor and are adding an SCR drive, what do you do to the interpoles? - Answer: Leave the interpoles alone. When adding a SCR drive to the generator, the series loop is removed, as are the 3 resistors. Everything else remains the same A hydro runs up with no load but will not run with a full load. What is the issue? - Answer: The relief valve is set too low - 815 Runby for a 1:1 hits the CWT buffer 4" below the top landing. CWT runby should be set at 18". How much should the ropes be shortened? - Answer: 22" - 235 You need to work on a freight door retiring cam, you LOTO the main line but there is still power on the cam. What circuit is still hot? - Answer: Door Operator disconnect -535 The contractor requests that the vertical center of a Rack and Pinion hoist be moved. How do you do this? - Answer: Adjust tie downs and wall ties - 850 Working pressure on a Hydro is 400 PSI. What is the maximum relief valve setting? - Answer: 400 x 150%= 600 PSI - 815 What must be installed on a false care before operation? - Answer: Spring Loaded safeties - 110 There is slight arcing between the brush and commutator. What action must be taken? - Answer: None Note: Heavy arcing= light brush pressure, Heavy brush pressure= mechanical wear If rigging is roped 3:1 and a BEAM CLAMP is used to lift a 6,000lb load. What is the beam capacity? - Answer: 18,000lbs -210 How much resistance is measured over a normally closed switch? - Answer: .2 Ohms- should be zero but will never be that low A car traveling in the hoistway always stops at the same spot and blows a fuse. What causes this? - Answer: traveling cable has a cut/exposed wire or a short - 515 How is a class 1 yearly buffer test preformed? - Answer: Car at the bottom landing and on inspection, jump out direction and final limits. With pit clear, run down to compress the buffers, buffers should fully extend within 90 seconds. Note: 5 yr is Full load, full speed - 555 How many strain supports are required on a 350 ft raceway? - Answer: 4 1 every 100ft - 505-510 How is stainless steel drilled out? - Answer: Slow speed and constant pressure - 205 What is the required amout of retainer clips for wedge shackles and what is the spacing? - Answer: At least 2. First clip being 4 times the diameter of the rope from the top of the shackle, and the second clip is 8 times the diameter of the rope away from the shackle. - 245 A 300 ohm resistor burns out, but you dont have another one. How can you make one? - Answer: 2- 600 ohms resistors in parallel is 300 ohms. Resistance is half of the highest resistor in the parallel circuit. 3- 225 ohms is 75 ohms. - 345 When cutting laminated panels, which direction should the finish side face? - Answer: Finish side facing the cutting edge of the tool. Blade will burr the backside. - 225 How do you cut a finished floor? - Answer: Cutting blade away from the finished side - 255

Show more Read less
Institution
Mechanics NEIEP
Course
Mechanics NEIEP

Content preview

M.E. NEEP Exam
Questions and
Complete Solutions
Graded A+
Denning [Date] [Course title]

,A contractor wants to raise the car speed from 100 fpm to 125 fpm, it currently has a 12" sheave. What
is required? - Answer: 100 fpm/125 fpm= 12"/ X =15



A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot read voltage or resistance. What
should you do? - Answer: Replace it with a larger MOV - 630



On a Ward-Leonard circuit the brake is set, but the motor is trying to slip through the brake. What is the
issue? - Answer: Suicide Circuit - 425



You have an old DC motor and are adding an SCR drive, what do you do to the interpoles? - Answer:
Leave the interpoles alone. When adding a SCR drive to the generator, the series loop is removed, as are
the 3 resistors. Everything else remains the same



A hydro runs up with no load but will not run with a full load. What is the issue? - Answer: The relief
valve is set too low - 815



Runby for a 1:1 hits the CWT buffer 4" below the top landing. CWT runby should be set at 18". How
much should the ropes be shortened? - Answer: 22" - 235



You need to work on a freight door retiring cam, you LOTO the main line but there is still power on the
cam. What circuit is still hot? - Answer: Door Operator disconnect -535



The contractor requests that the vertical center of a Rack and Pinion hoist be moved. How do you do
this? - Answer: Adjust tie downs and wall ties - 850



Working pressure on a Hydro is 400 PSI. What is the maximum relief valve setting? - Answer: 400 x
150%= 600 PSI - 815



What must be installed on a false care before operation? - Answer: Spring Loaded safeties - 110



There is slight arcing between the brush and commutator. What action must be taken? - Answer: None

Note: Heavy arcing= light brush pressure, Heavy brush pressure= mechanical wear

, If rigging is roped 3:1 and a BEAM CLAMP is used to lift a 6,000lb load. What is the beam capacity? -
Answer: 18,000lbs -210



How much resistance is measured over a normally closed switch? - Answer: .2 Ohms- should be zero
but will never be that low



A car traveling in the hoistway always stops at the same spot and blows a fuse. What causes this? -
Answer: traveling cable has a cut/exposed wire or a short - 515



How is a class 1 yearly buffer test preformed? - Answer: Car at the bottom landing and on inspection,
jump out direction and final limits. With pit clear, run down to compress the buffers, buffers should fully
extend within 90 seconds.

Note: 5 yr is Full load, full speed - 555



How many strain supports are required on a 350 ft raceway? - Answer: 4

1 every 100ft - 505-510



How is stainless steel drilled out? - Answer: Slow speed and constant pressure - 205



What is the required amout of retainer clips for wedge shackles and what is the spacing? - Answer: At
least 2. First clip being 4 times the diameter of the rope from the top of the shackle, and the second clip
is 8 times the diameter of the rope away from the shackle. - 245



A 300 ohm resistor burns out, but you dont have another one. How can you make one? - Answer: 2-
600 ohms resistors in parallel is 300 ohms. Resistance is half of the highest resistor in the parallel circuit.
3- 225 ohms is 75 ohms. - 345



When cutting laminated panels, which direction should the finish side face? - Answer: Finish side facing
the cutting edge of the tool. Blade will burr the backside. - 225



How do you cut a finished floor? - Answer: Cutting blade away from the finished side - 255

Written for

Institution
Mechanics NEIEP
Course
Mechanics NEIEP

Document information

Uploaded on
August 14, 2024
Number of pages
22
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
YourExamplug Grand Canyon University
View profile
Follow You need to be logged in order to follow users or courses
Sold
179
Member since
1 year
Number of followers
26
Documents
15591
Last sold
1 week ago
Your Exm Plug

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!!!!!!!!!!!

Read more Read less
4.3

67 reviews

5
38
4
16
3
7
2
4
1
2

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions