100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Practice Test NERC Questions Latest Update Questions and 100% Verified Correct Answers Actual Exam Guaranteed A+ $20.49   Add to cart

Exam (elaborations)

Practice Test NERC Questions Latest Update Questions and 100% Verified Correct Answers Actual Exam Guaranteed A+

 9 views  0 purchase
  • Course
  • NERC
  • Institution
  • NERC

Practice Test NERC Questions Latest Update Questions and 100% Verified Correct Answers Actual Exam Guaranteed A+

Preview 3 out of 28  pages

  • August 14, 2024
  • 28
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NERC
  • NERC
avatar-seller
Tutordiligent
Practice Test NERC Questions Latest Update
2024-2025 235 Questions and 100% Verified
Correct Answers Actual Exam Guaranteed A+

________will be sold as a non-firm transmission product during EEA2 - CORRECT
ANSWER: Capacity Benefit Margin


A ___________ tool is used to ensure the power system can respond within acceptable
limits N-1 conditions - CORRECT ANSWER: Contingency Analysis


A ___________ tool is used to ensure the power system can respond within acceptable
limits of N-1 - CORRECT ANSWER: Contingency Analysis


A 0.3 Hz drop occurs, causing a 500 MW generator to increase its output from 400 MW
to 450 MW. What is the % droop of this generator? - CORRECT ANSWER: 5%


A 1000 MVA rated generator that produces 800 MW and 100 MVAR is best described
as? - CORRECT ANSWER: Operating in a lagging mode. Inductive system


A 230 kV transmission line is energized at 230 kV and is 100 miles long what is the
approximate line charging contribution of this transmission line? - CORRECT ANSWER:
30 MVAR 230 kV= 1/3 MVAR per mile


A 230/115 kV transformer is rated at 100 MVA and has 80 MW entering the primary
side. What would you expect the real power output to be on the secondary side? -
CORRECT ANSWER: 80 MW


A 230kV transmission line is energized at 230kV and is 100 miles long. What is the
approximate line charging contribution? - CORRECT ANSWER: 30MVAR

,A 500 MW generator trips in a BA to external to your BA. Which of the following
responses would you expect to see in your Area? - CORRECT ANSWER: Positive Net
Actual Interchange deviation


A 800 MW generator is synchronized and loaded at 650 MW. The generator can ramp
at 5 MW min. What is the amount of spinning reserve presently available on the unit? -
CORRECT ANSWER: 75 MW


A BA is experiencing low voltage in the northeast region. A 50 MVA generator in that
area is loaded at 50 MWs. What action could a System Operator take to increase the
voltage in that area? - CORRECT ANSWER: Decrease real power and increase
reactive power


A BA with a bias setting of -200MW/0.1Hz changed NIs by +40MW as their part of a
time error correction. The BA system operator decides instead of changing their NIs
they will change their Fs value. The Fs value would be what? - CORRECT ANSWER:
60.02 Hz


A BA's ACE is 0 as long as which of the following is maintained? - CORRECT
ANSWER: The balance between actual and scheduled interchange plus the proper
contribution to interconnection frequency regulation


A bus with a closed breaker and then open end breaker. Draw a line of the voltage
profile - CORRECT ANSWER: Close to open Voltage profile will increase when getting
closer to the open breaker


A certain dynamic schedule is tagged for an average flow of 100 MW. By what min
amount would this schedule have to change before the tag must be updated? -
CORRECT ANSWER: 26 MW


A certain dynamic schedule is tagged for an average flow of 100 MW. By what minimum
amount would this schedule have to change before the Tag must be updated? -
CORRECT ANSWER: 26 MW

, A contingency results in the accidents of a IROL.What could be the result if the IROL is
allowed to be exceeded longer than its Tv? - CORRECT ANSWER: Interruption of
power to a large part of the BES


A contingency results in the exceedance of an IROL. What could be the result if the
IROL is allowed to be exceeded longer than T sub v - CORRECT ANSWER: Interruption
of power to a large part of the BES


A contingency results in the exceedance of an IROL. What could be the result if the
IROL is allowed to be exceeded longer than Tv? - CORRECT ANSWER: Interruption of
power to a large part of the BES


A dynamic schedule is tagged for 25 MW. By what min % amount would this flow have
to change to change before the Tag must be updated? - CORRECT ANSWER: More
than 100%


A GDM is predicted to occur tomorrow which parts of the system are most likely to
experience problems - CORRECT ANSWER: Wye connected transformers


A generator delivers its power to a multi line transmission system. Of the multiple lines
connected to the generator bus, line X absorbs 25% of the generator output is line X as
a transfer limit of 200 MW what is the maximum output of the generator? - CORRECT
ANSWER: 800 MW .25/200 = 1/x cross multiply


A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW
draw? - CORRECT ANSWER: 90 pf= mw/mva


A major TO line has been scheduled out for maintenance. Other outages have occurred
and the load will be greater than originally expected. The system operator should: -
CORRECT ANSWER: Preform a load flow study prior to allowing the previously
scheduled


A portion of a RC is experiencing low voltage. What directives should the RC give? -
CORRECT ANSWER: Lower transfer across the area and decrease generation.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Tutordiligent. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $20.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76710 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$20.49
  • (0)
  Add to cart