KNOWN NERC EXAM QUESTIONS From Class Latest Update Questions and 100% Verified Correct Answers Actual Exam Guaranteed A+

Preview 3 out of 20  pages

  • August 14, 2024
  • 20
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • KNOWN NERC
  • KNOWN NERC
avatar-seller
Tutordiligent
KNOWN NERC EXAM QUESTIONS From Class
Latest Update 2024-2025 140 Questions and
100% Verified Correct Answers Actual Exam
Guaranteed A+

A 50 MVA generator is currently producing 40 MWs and 10 MVARs. What are the
dynamic reactive reserves currently on this generator?


a) 50
b) 30
c) 0
d) 20 - CORRECT ANSWER: d) 20


A Balancing Authority has a Frequency Bias Setting of -200 MW/.1Hz. What is the
Balancing Authority's Frequency Response for a frequency of 59.95 Hz?


a) 10 MWs
b) 50 MWs
c) 100 MWs
d) 200 MWs - CORRECT ANSWER: c) 100 MWs


A Balancing Authority is scheduled to receive 300 MWs from the north and 400 MWs
from the south for hour ending 1300. The north schedule is curtailed starting at 1220
with a 10-minute ramp. What is the Net Interchange for the hour?


a) 450 MWh
b) 500 MWh
c) 550 MWh
d) 600 MWh - CORRECT ANSWER: b) 500 MWh

,A Balancing Authority notices that Operating Reserve has steadily declined throughout
the hour. What is the most likely cause?


a) Loss of a large generator in the area
b) An inaccurate load forecast
c) Loss of a major transmission line
d) A malfunction of EMS - CORRECT ANSWER: b) An inaccurate load forecast


A Balancing Authority receives an Operating Instruction from its Reliability Coordinator.
The Balancing Authority must comply with the Operating Instruction unless:


a) It results in separation from the Interconnection
b) The Balancing Authority disagrees with it
c) Has serious financial implications
d) Results in danger - CORRECT ANSWER: d) Results in danger


A contingency results in the exceedence of an IROL. What could be the result if the
IROL is allowed to be exceeded longer than its Tv?


a) Loss of power to a local area
b) The transmission line could fail
c) Protective relays could fail
d) Interruption of power to a large part of the BES - CORRECT ANSWER: d)
Interruption of power to a large part of the BES


A study shows that a single contingency would result in an IROL violation and the
corrective action would require opening a breaker with no SCADA control due to a failed
RTU. What should the system operator do first?

, a ) Dispatch field personnel to the breakers substation
b) Shed load near the IROL location
c) Re-dispatch generation to reduce line loading
d) Develop a new response plan for the contingency - CORRECT ANSWER: a )
Dispatch field personnel to the breakers substation


A System Operator is conducting switching operations. When he opens one end of a
transmission line, there is an indication of load loss. What should the operator do?


a) Continue with the switching operation and investigate when complete
b) Suspend the switching operation and verify indications
c) Immediately close the breaker back in
d) File a report to NERC for loss of firm load - CORRECT ANSWER: b) Suspend the
switching operation and verify indications


A transaction of 100 MWs is scheduled out of your area at the top of the hour with a 10-
minute ramp. You have the following generation available: What combination of
generation would need to be used?


Generator________MWs_________ Curren MWs________ Ramp Capability
1_____________________100 MW______50 MW________________5 MW/min
2____________________100 MW______40 MW________________3 MW/min
3____________________100 MW______50 MW________________1 MW/min
4____________________100 MW______60 MW________________2 MW/min


a) Generators 1, 2 & 3
b) Generators 1, 3 & 4
c) Generators 1, 2 & 4
d) Generators 2, 3 & 4 - CORRECT ANSWER: c) Generators 1, 2 & 4

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Tutordiligent. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $20.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78677 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$20.49
  • (0)
  Add to cart