The use of a BIM model on a project can lead to faster
construction as a result of which of the following factors?
a. Increased prefabrication
b. Increased changes
c. Reduced claims
d. Reduced design Correct Answer Answer: Increased
prefabrication
The standard of care to which a CM is likely to be held is:
a. That of a licensed architect performing construction
administration services
b. That of a licensed contractor managing sub-contractors
on a similar project
c. That of how other professionals in the industry generally
perform
d. That of a general contractor working on a similarly
priced project Correct Answer Answer: That of how other
professionals in the industry generally perform.
Actual usage of a particular contract form for the
construction phase depends on:
a) The particular delivery system being used.
,b) The type of project being implemented and the
completion status of the plans and specifications at the
time of contracting.
c) The consideration of any performance requirements,
the level of sophistication of the owner, and the role of the
architect/engineers involved.
d) All of the above Correct Answer Answer: All of the
above
The possible approaches for delivering a project are
virtually unlimited. A key reason for such variation is
a. The different roles that can be assumed by projects
participants.
b. Different forms of contracts and methods of
compensation that can be used.
c. The different levels of care, responsibility, and risks
assumed by the parties involved.
d. All the above. Correct Answer Answer: d) All the above
The traditional delivery system is characterized by
executing the major phases of a project in:
a. An overlapping concept
b. A linear sequence
c. A fast track method
d. All of the above Correct Answer Answer: A linear
sequence
A key advantage of the traditional delivery approach is:
a. With the traditional delivery system, the cost of the
construction phase is known before constructions starts.
b. Facility features are fully determined & specified
,c. When the construction contract is signed, the major risk
belongs to the contractor.
d. All of the above. Correct Answer Answer: Facility
features are fully determined & specified
What regulations define and differentiate public and
private sector contracting?
a. OSHA
b. CMAA Standard Contract Form A-1
c. FAR
d. ADR Correct Answer Answer: FAR
What is a principal differentiator between public and
private sector contracting?
a. Advantage in contract language
b. Innovative designs
c. Sustainability goals
d. All of the above. Correct Answer Answer: Advantage in
contract language
Which of the following methods of compensation for CM
services is inconsistent with the CM's agency relationship
to its owner?
a. Fixed fee
b. Percentage of construction costs
c. Multiple of direct personnel expenses
d. Professional fee plus expense Correct Answer Answer:
Multiple of direct personnel expenses
, In cases where a project is extended in duration for
reasons beyond the control of the CM, it is imperative that
the CM agreement address:
a. How changes in scope and additional services will be
handled
b. Extended CM services
c. The cost of additional services
d. All of the above. Correct Answer Answer: All of the
above.
The most common basis of CM liability to a trade
contractor with whom the CM has no contractual
relationship is negligent performance of the CM's
a. Cost estimating
b. Inspection of work
c. Project coordination and scheduling
d. All of the above Correct Answer Answer: Project
coordination and scheduling
Most publicly funded projects require which of the
following inclusions as part of their contract obligations?
a. Performance bond
b. BIM Model
c. Mock-up model
d. LEED Gold Correct Answer Answer: Performance Bond
A Public-Private Partnership (P3) project is usually
considered by a public entity for which of the following
primary reasons:
a. Better design
b. Incorporate environmental requirements
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller TUTORWAC. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $22.99. You're not tied to anything after your purchase.