100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PJM Paper Study Guide Questions and Answers $19.49   Add to cart

Exam (elaborations)

PJM Paper Study Guide Questions and Answers

 4 views  0 purchase
  • Course
  • Pjm
  • Institution
  • Pjm

PJM Paper Study Guide

Preview 3 out of 19  pages

  • August 14, 2024
  • 19
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Pjm
  • Pjm
avatar-seller
julianah420
PJM Paper Study Guide


This type of warning is issued when available Synchronized Reserves are less than the
Synchronized Reserve requirement. - answerA. Voltage Reduction Warning

For voltage support, TOs can request generators: - answerAdjust MVAR output within
voltage schedule

The activation of reserves is used to control for all of the following except: - answer

Which of the following are considered Emergency Mandatory Load Management
Reductions? (select 2)
A. Capacity resource of interruptible load for reliability
B. Generating plant resources that can reduce plant load for reliability
C. Intermittent resources that can increase load for reliability
D. Demand resource of interruptible load for reliability - answerCapacity resource of
interruptible load for reliability

Demand resource of interruptible load for reliability

This type of warning is issued when available Synchronized reserves are less than the
Synchronized Reserve requirement. - answerVoltage Reduction Warning

How are Operating Instructions Issued? - answerDirect Phone Call


PJM All-Call

Actions in a Low Voltage Alert include - answerReview transmission and generation
outages


Request a Reactive Reserve Check

This type of capacity alert is issued when the estimated operating reserve capacity is
less than the forecasted synchronized reserve requirement. - answerVoltage Reduction
Alert

During a Heavy Load Voltage Schedule Action, all Generation Owners/Operators will be
directed to - answerMaintain a MVAR reserve on units connected at the EHV level

,When PJM issues a High System voltage Message, the GO should have its units
operate at: - answerThe lower end of their voltage bandwidth

The activation of reserves is used to control for all of the following except: -
answerVoltage Drop Violations

Select the data elements used in the Tier 1 Spinning Reserve estimation -
answerSpinning Reserve Maximum Limit


Spinning Reserve Ramp Rate

A NERC energy Emergency Alert (EEA) Level 1 is issued during which of the following
capacity alerts? - answerMaximum Generation Emergency Alert

The following would be considered non-critical plant load - answerLighting

Office Area Air Conditioners

This action is issued to provide relief when all other possible means of supplying
internal load have been exhausted to prevent a catastrophe within PJM or to maintain
the schedules so as not to jeopardize the reliability of other interconnected regions. -
answerManual Load Dump

The reserve capability that can be fully converted into energy within a 30-minute
timeframe is defined as: - answerOperating Reserve

When is a Voltage Reduction Warning issued? - answerWhen Synchronized Reserve is
less than Synchronized Reserve Requirement

What is the Synchronized Reserve Requirement? - answer100% of largest single
contingency

During a Voltage Reduction Action, - answerVoltages are reduced on the distribution
system in order to reduce demand

What is the Primary Reserve Requirement based on? - answer150% of the real-time
largest single contingency

When load relief is still needed to maintain tie schedules, and/or to increase
transmission system voltages, PJM will issue which of the following procedures? -
answerVoltage Reduction Action

What is the trigger for issuing a Deploy All Resources Action? - answerWhen unplanned
events such as the loss of a transmission or generating facility have resulted in reliable
operations being jeopardized

, Which of the following statements regarding emergency procedures is true? -
answerIssuance and Cancellation of emergency procedures are broadcast over the All-
Call

What type/level of emergency procedure is issued during present operations to inform
members of actual capacity shortages or contingencies that may jeopardize reliable
operation? - answerWarnings

Which emergency procedure will PJM issue when the available Primary Reserve
capacity is less than the largest operating generator, or the loss of a transmission facility
jeopardizes reliable operations after all possible measures are taken to increase
reserves? - answerManual Load Dump Warning

What is the trigger for issuing a Deploy All Resource Action? - answerWhen unplanned
events such as the loss of a transmission or generating facility have resulted in reliable
operations being jeopardized.

. Which of the following steps would PJM take as part of initiating Conservative
Operations? - answerInitiate additional off-cost operations to limit or reduce flows
across critical interfaces


Perform job studies looking at the loss of multiple pieces of equipment as a single
event

When load relief is still needed to maintain tie schedules, or/or to increase transmission
system voltages, PJM will issue which of the following procedures? - answerVoltage
Reduction Action

When unplanned events such as the loss of transmission or generating facility(s) results
in reliable operations being jeopardized such that a Voltage Reduction Action or a
Manual Load Dump Action may be required, PJM will issue a - answerDeploy All
Resource Action

What is the Primary Reserve Requirement based on? - answer150% of the real-time
largest single contingency

Which of the following statements regarding emergency procedures is true? -
answerIssuance and Cancellation of emergency procedures are broadcast over the All-
Call

When is a Primary Reserve Warning issued? - answerWhen primary reserve is less
than the primary reserve requirement but greater than the synchronized reserve
requirement

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller julianah420. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $19.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

62555 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$19.49
  • (0)
  Add to cart