100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PJM 2024 QUESTIONS AND ANSWERS 2024 $18.49   Add to cart

Exam (elaborations)

PJM 2024 QUESTIONS AND ANSWERS 2024

 3 views  0 purchase
  • Course
  • Pjm
  • Institution
  • Pjm

Exam of 21 pages for the course Pjm at Pjm (PJM 2024)

Preview 3 out of 21  pages

  • August 14, 2024
  • 21
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Pjm
  • Pjm
avatar-seller
julianah420
PJM 2024

During System Restoration, what is the optimal Frequency Range? - answer59.75 - 61
Hz

The 500 kV system has normal bus voltages between? - answer500 to 550 kV

When Connecting 2 islands, the operator must match? - answerVoltage, Phase Angle
and Frequency

What are the Minimum Source Requirements-(500kV+) for a 500 kV? - answer30 MW
Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV

When will PJM issue a Minimum Generation Alert? - answerWhen expected generation
levels fall within 2500 MW of normal operating limits

When thunderstorm is nearing critical bulk power or 500 kV system? - answerEnsure
auto reclosing is turned ON

What does SCADA stand for? - answerSupervisor Control & Data Acquisition

What does IROL stand for? - answerInterconnected Reliability Operating Limit

What does eDART stand for? - answerDispatch Application & Reporting Tool

What is eDART used for? - answerIt is used for: Generation Outage Scheduling,
Instantaneous Reserve Checks, Generator Reactive Capabilities and to enter and
submit switching

What direction do VARS flow? - answerFrom HIGH Voltage to LOW Voltage

What direction do MW flow? - answerFrom HIGH Phase Angle to LOW Phase Angle

Which of the following factors are used in forecasting load? - answerWeather Forecast,
Historical Load Data, and Historical Weather Data

What one-way communication system is used to disseminate info to local call centers? -
answerAll-Call

The 3 categories of messages issued by PJM All-Call are? - answerOperational,
Informational and Emergency Procedures

,When should, transmission outages should be submitted to PJM to avoid cancellation
and to be considered "on time?' - answerFirst day of Month Prior to the Outage

What report will be requested by PJM when a Max Generation Alert is issued? -
answerSupplementary Status Report (SSR)

The loss of a large generation unit on the PJM system can be detected by monitoring: -
answerFrequency and PJM Area Control Center (ACE)

The PJM system is operated such that the contingency flow is less than the: -
answerEmergency Rating

When ordered a 5% voltage reduction should be taken on: - answerThe Distribution
System

TOs are required to report "Hot Line Work" on what voltage levels? - answer345 kV and
Above

Load dump rating of an EHV line is determined by? - answer115% of the facility's 4 hour
Emergency Rating

During System Restoration, one means of strengthening & stabilizing an interconnected
area is to: - answerClose additional tie lines

Which of the following factors influence load forecast? - answerWeather, Temperature,
and the Day of the Week

During system restoration, what is the voltage range the system should be kept
between? - answer90% and 105% -- maintain voltage profile between for system
restoration

PJM will coordinate and direct all restoration lines of what voltage levels? - answer500
kV (PJM also coordinates Identifying Interconnection and calculating ACE)

**Also coordinates Interchange Schedules and all ties

How much load would you dump to increase the frequency by 1 Hz? - answer6-10%

Generation is disconnected after 5 seconds, when the frequency: - answerDrops below
57.5 Hz

How much of the total Dynamic Reserve should be used on Under Frequency relay
load? - answer50%

During System Restoration, capacitor banks should be kept off until how much of the
load is restored? - answer40%

, Would PJM assume Frequency Control when the control of an interconnected area is
too burdensome for any Local Control Center? - answerYes

Operator receiving an All-Call message should state the following before playback of
the message? - answerName and Company

Dynamic Reserves consist of: - answerGovernor Reserve and Load that has been
restored with under frequency relays

What would be the appropriate response to receiving a DC ground Alarm? -
answerAdvise substation personnel of the alarm during normal hours

The unit Minimum and Maximum MVAR limits include: - answerRealistic, usable
capability that is sustainable during continuous long term unit operation

What effects can Temperature have on system loading? - answerOverloads on system,
swings in temp. cause increased loading, trips trans. facilities

What are some characteristics of humidity? - answerComponent of THI and does not
change the temperature

Higher ambient temperatures will result in? - answerLower ratings because of less
ability to dissipate heat

When severe weather is expected, PJM may take what actions? - answerRequest
reclosing to be put into service, defer maintenance to critical BES facilities, and initiate
conservative operations (Also just in general poses risk of losing many facilities)

What instability is characterized by continued oscillations over a long period of time? -
answerDynamic

What is part of PJMs Thermal Operating Criteria? - answerActual Flows within
Emergency Rating

What are some reasons voltages can fall below acceptable limits? - answerExcessive
VAR loading and Voltage Regulation malfunction

What will rescheduling transmission outages to the Shoulder Months do? - answerEntail
more coordination between PJM and TO to avoid conflict

What would be required for a company to use dynamic ratings in their equipment? -
answerAdd additional equipment to monitor weather conditions

TOs who have not provided a voltage schedule to Gen Owners should instruct them to
follow? - answerPJM default voltage schedule

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller julianah420. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $18.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

62555 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$18.49
  • (0)
  Add to cart