1. Schedule: Which of the following completes this statement: A project is success-
n n n n n n n n n n n
n ful if it
n n
meets the triple constraints of scope,
n n n n n , and budget?
n n
2. Program: Which of the following is a group of related projects?n n n n n n n n n n
3. Stakeholder engagement: Which of the following is the process of communicat- n n n n n n n n n n
n ing and interacting with
n n n
stakeholders in a way that keeps them interested and focused on their
n n n n n n n n n n n
n involvement in the project? n n n
4.Balanced: In which matrix structure is the PM's level of authority low to moderate?
n n n n n n n n n n n n n
5. The Project Management Institute (PMI): The Project Management Profession-
n n n n n n n n
n al (PMP) and Certified Associate in Project
n n n n n n
Management (CAPM) certifications are offered by which organization? n n n n n n n
6. The organization has difficulty utilizing resources across functions.: Which of
n n n n n n n n n
n the following is a disadvantage of the functional organization?
n n n n n n n n
Team members n
7. Projectized Organization: In which of the following organizations do subject
n n n n n n n n n
n matter experts from different n n n
functions directly report to the project manager for a specific project?
n n n n n n n n n n
8. 8 and 80 Rule: According to the
n n n n n n , a project manager should avoid
n n n n n
n controlling tasks n
that take less than eight hours and should not let more than two weeks go by without
n n n n n n n n n n n n n n n n
n checking in. n
9. The PM must have enough work to keep SMEs busy full-time or risk losing
n n n n n n n n n n n n n
n them to another project or functional area: Which of the following is an advantage
n n n n n n n n n n n n n
n of the projectized organization?
n n n
1 n/
, Project Management WGU - Pre Assessment n n n n n
10.Level 4: At which level in the OPM3 is there more refined documentation,
n n n n n n n n n n n n
n consistent
management support, consistent execution, and efficiency across all projects?
n n n n n n n n
11.Team status reports: Which of the following reports are often updated in an
n n n n n n n n n n n n
n online collaboration tool
n n
and published weekly?
n n
12.Projectized: In which organization do subject matter experts from different
n n n n n n n n n
n functional areas n
report directly to the project manager for a specific project?
n n n n n n n n n
13.Project objective: Which of the following represents an important business
n n n n n n n n n
n need or issue and
n n n
provides an opportunity for others to create an appropriate, valuable solution?
n n n n n n n n n n
14.Policies and procedures may be applied inconsistently.: Which of the follow-
n n n n n n n n n n
n ing is a disadvantage of the projectized organization?
n n n n n n n
2 n/
, Project Management WGU - Pre Assessment n n n n n
15.A business scenario: a description of a business situation or problem that
n n n n n n n n n n n
n describes:
past events that are relevant,
n n n n
n current key information, and
n n n
n expected or desired outcomes.
n n n
16.scope, budget, and schedule: What are the objectives of project manage-
n n n n n n n n n n
n ment?
17.triple constraints: final scope, schedule, and budget plans are captured as
n n n n n n n n n n
n baselines for the project, n n n
18.Policies and procedures may be applied inconsistently.: disadvantage of the
n n n n n n n n n
n projectized organization? n
19.The approach is expensive because of the duplication of personnel: disad-
n n n n n n n n n n
n vantage of the matrix organization
n n n n
20.Cost: In Project A, the contract specifies that time is very important. All of the
n n n n n n n n n n n n n n
n scope must be completed, or the project will fail. The project's objective requires the
n n n n n n n n n n n n n
n project team to work as quickly as possible.
n n n n n n n
Which triple constraint can be adjusted to permit the project team to work as quickly
n n n n n n n n n n n n n n
n as possible?
n
Time Cost n
n Price
n Incentive
s
3 n/
, Project Management WGU - Pre Assessment
n n n n n
21.Scope: A general contractor is managing a highway construction project that will
n n n n n n n n n n n
n repair a flood-damaged road. The project was documented in a cost-plus-incentive
n n n n n n n n n n
n fee contract that specified a completion date of June 30. The Department of Trans-
n n n n n n n n n n n n n
n portation has offered an incentive for early completion of the repairs.
n n n n n n n n n n
Which triple-constraint baseline remains unchanged by the effects of the incentive?
n n n n n n n n n n
22.Time: In Project B, all of the scope must be completed, or the project will fail. The
n n n n n n n n n n n n n n n n
n work is important but not urgent.
n n n n n
Which triple constraint can be adjusted if the project's objective requires the project
n n n n n n n n n n n n
n team to work at the lowest possible cost?
n n n n n n n
Time
n Cost
4 n/
Voordelen van het kopen van samenvattingen bij Stuvia op een rij:
Verzekerd van kwaliteit door reviews
Stuvia-klanten hebben meer dan 700.000 samenvattingen beoordeeld. Zo weet je zeker dat je de beste documenten koopt!
Snel en makkelijk kopen
Je betaalt supersnel en eenmalig met iDeal, creditcard of Stuvia-tegoed voor de samenvatting. Zonder lidmaatschap.
Focus op de essentie
Samenvattingen worden geschreven voor en door anderen. Daarom zijn de samenvattingen altijd betrouwbaar en actueel. Zo kom je snel tot de kern!
Veelgestelde vragen
Wat krijg ik als ik dit document koop?
Je krijgt een PDF, die direct beschikbaar is na je aankoop. Het gekochte document is altijd, overal en oneindig toegankelijk via je profiel.
Tevredenheidsgarantie: hoe werkt dat?
Onze tevredenheidsgarantie zorgt ervoor dat je altijd een studiedocument vindt dat goed bij je past. Je vult een formulier in en onze klantenservice regelt de rest.
Van wie koop ik deze samenvatting?
Stuvia is een marktplaats, je koop dit document dus niet van ons, maar van verkoper Prose1. Stuvia faciliteert de betaling aan de verkoper.
Zit ik meteen vast aan een abonnement?
Nee, je koopt alleen deze samenvatting voor $13.99. Je zit daarna nergens aan vast.