LSU CM 4100 Construction Scheduling and Cost Control final exam questions and answers Louisiana State Universit1 $17.99   Add to cart

Exam (elaborations)

LSU CM 4100 Construction Scheduling and Cost Control final exam questions and answers Louisiana State Universit1

 1 view  0 purchase
  • Course
  • Institution

LSU CM 4100 Construction Scheduling and Cost Control final exam questions and answers Louisiana State Universit1

Preview 2 out of 9  pages

  • August 15, 2024
  • 9
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
avatar-seller
LSU CM 4100 Construction Scheduling and Cost
Control final exam questions and answers Louisiana
State University

All of the following are functions of Construction Management except: - ANSWER
Financing the project

Which is not a part of the three legged stool of construction? - ANSWER Efficiency

Which of the following is the definition for project scope? - ANSWER Sets the
parameters for the work and defines what work needs to be done

Which of the following is NOT a Project Delivery method? - ANSWER Agency CM

What sums up the role of the Quality Surveyor? - ANSWER Works with the senior
estimator, must have a good understanding of the construction process, & must be
able to read plans

Which of the following is considered a trait of a good Construction Manager? -
ANSWER Tenacious, Risk-taker, & Business Knowledge

Who determines what method of delivery is used on a project? - ANSWER Owner

What sums up the role of an Area Superintendent? - ANSWER Assists the Project
Superintendent on large projects

What sums up the role of a Field Engineer? - ANSWER Works directly for the
superintendent, Responsible for project layout and dimensional accuracy, &
Responsible for communication with subcontractors

What is the best description of Design-Build Construction? - ANSWER The owner
contracts with a design/build entity, which is responsible for the project

Open bidding is required on public projects because________? - ANSWER They
are funded by taxpayer dollars

What is the tool used to reduce the number of bidders on a public project and to
increase the quality of the contract pool? - ANSWER Prequalification

Which type of bond guarantees that the payment for a contractor's labor and
materials used on the project will be made? - ANSWER Labor and Materials Bond

Where are the notice documents that inform the public of upcoming projects found? -
ANSWER Posted electronically on construction project lead services, & Trade
Magazines

, Identify the correct pairing of the most common procurement method and selection
criteria? - ANSWER Design-Bid-Build and Low Bid Selection

What is the name of the official document that notifies the contractor to start
construction? - ANSWER Need to Proceed

Which best describes the weighted criteria evaluation process? - ANSWER Award
the project based on low total points for qualitative and price components

Which are factors that are commonly considered before deciding to bid on a
construction job? - ANSWER Location of the project, Size of the job, & Who the
architect/owner is

If missing, which one of the below items would deem a bid non responsive? -
ANSWER Bid Bond, Certificates of Insurance, & Subcontractors List

Narrowing the field of offers through the selection of the most qualified proposers on
the basis of qualifications is know as: - ANSWER Shortlisting

Who is involved in the production of the project drawings? - ANSWER Architect,
Civil Engineer, & Structural Engineer

Which of the following would you NOT expect to find on the drawings when a project
is put out for bid? - ANSWER Contractor's Name

Which of the following drawings takes precedence if a discrepancy occurs in the
plans? - ANSWER Detail Drawing

Which of the following is included in the bidding documents? - ANSWER
Advertisement to bidders, Instruction to bidders, & Agreement form

Which of the following is NOT discussed in the technical specifications? - ANSWER
Owner provided materials

Which of the following contract types is most popular with Design-Build project
delivery? - ANSWER Guaranteed maximum price

Which of the following would you expect to find in the supplementary conditions? -
ANSWER Soil testing information, Job signage requirements, & Phasing
requirements

In CSI MasterFormat, which division contains "finishes"? - ANSWER Division 9

Which of the following contracts is the most common on construction projects? -
ANSWER Lump Sum

Who determines the type of contract to be used on a construction project? -
ANSWER Owner

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller michealmuthii. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $17.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

64438 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$17.99
  • (0)
  Add to cart