Exam (elaborations)
API 653 Exam Prep Closed Book Only With Correct Questions And Answers 2024
API 653 Exam Prep Closed Book Only With Correct Questions And Answers 2024
[Show more]
Preview 4 out of 33 pages
Uploaded on
August 15, 2024
Number of pages
33
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
api 653 exam prep closed book
api 653 defines a storage tank engineer as
similar service is means of estimating corrosion r
controlled deposition welding methods in lieu of
inspection hold points for
Institution
API 653
Course
API 653
$15.49
100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached
API 653 Exam Prep Closed Book Only With
Correct Questions And Answers 2024
API u653 udefines ua u"Storage utank uengineer" uas:
A) uA uregistered uprofessional uengineer uin ustructural usteel ufabrication
B) uPerson uor uorganization uwho uis uknowledgeable uand uexperienced uin uthe uengineering
udisciplines uassociated uwith uevaluating uthe uintegrity uand ureliability uof uaboveground
ustorage utanks
C) uthe uengineering udepartment uof ua ucontractor uwho umakes urepairs uto uaboveground
ustorage utanks
D) uA uprofessional uengineer uwho uis ualso uan uauthorized uAPI u653 uinspector u- ucorrect
uanswer.B
Similar uservice uis umeans uof uestimating ucorrosion urates uthat:
A) uIs uSeldom uused uas ua umeans uof uscheduling uinternal uinspection uintervals
B) uIgnores uenvironmental ufactors uin uthe udetermination uof ucorrosion urates
C) uMay ube uused uin uaddition uto uor uin ulieu uof uactual umeasurement uof ucorrosion urates
D) uIs ugenerally uconsidered uas uthe ubest umethodology ufor uestablishing uthe uinspection
uintervals u- ucorrect uanswer.C
Controlled uDeposition uwelding umethods, uin ulieu uof uPWHT, uis ulimited uto:
A) uP-1 umaterials
B) uP-1 uand uP-3 uMaterials uonly
C) uP-1, uP3, uand uP4 umaterials uonly
D) uP-5A umaterials u- ucorrect uanswer.C
Inspection uhold upoints, ufor utank ureconstruction, ushall ube udesignated uby:
A) uThe uauthorized uinspector
B) uAn uengineer uexperienced uin ustorage utank udesign
C) uAgreement ubetween utank uowner/user uand ureconstruction ucontractor
D) uAgreement ubetween uand uengineer uand uthe uauthorized u- ucorrect uanswer.A
All urepair uand ualteration uwork ushall ube uapproved uat uall udesignated uhold upoints uand uafter
ucompletion:
A) uNeed unot ube uapproved uif uapproved uwill udelay uwork uprogress
,B) uBy uthe urepair uorganization uof uthe urepairs uwere udone uaccording uto uthe uspecified
urepair uand/or ualteration uprocedures
C) uBy uthe uauthorized uinspector uor uexperienced ustorage utank uengineer
D) uBy uthe uauthorized uinspector uonly u- ucorrect uanswer.C
Alterations uto ustorage utanks, uwhich ucomply uwith uAPI u650, umust ube uauthorized uby:
A) uThe uowner/user
B) uThe ustorage utank uengineer
C) uThe uauthorized uinspector
D) uThe urepair uorganization u- ucorrect uanswer.B
A urecord uof unon-essential uvariables uused uduring uwelding uof uthe utest ucoupon uis:
A) uOptional uon uthe uPQR
B) uOptional uon uthe uWPS
C) uRequired uon uthe uPQR
D) uRequired uon uthe uWPQ u- ucorrect uanswer.A
Cracks uis uthe ushell uto ubottom uweld:
A) uShall ube uevaluated uper uthe u"As ubuilt" uStandard
B) uShall ube uremoved
C) uShall ube uevaluated uon ua ucase uby ucase ubasis
D) uShall ube uevaluated uper uAPI u579 u- ucorrect uanswer.B
What uwelding uprocess uis umost uwidely uused uin uthe urepair uof uprocess uequipment?
A) uGMAW
B) uGTAW
C) uSMAW
D) uFCAW u- ucorrect uanswer.C
The uowner uhas udecided uto uinstall ua unew ubottom uin uan uAST. uThe unew ubottom uwill ube
uinstalled uthrough uexisting utombstone ureinforcing uplates. uOne uMethod uis uto uremove uthe
ulower uportion uof uthe ureinforcing uplate. uAfter uthe unew uor ureplaced usection uis uinstalled,
uthe usplice uweld ushall:
A) uVisually uexamined uonly
B) uMagnetic uparticle uexamined uonly
C) uLiquid upenetrate uexamined uonly
D) uUltrasonic ushear uwave uexamined uonly u- ucorrect uanswer.B
Which uof uthe ufollowing uis uan uadvantage uof uthick ufilm ureinforced utank ubottom ulining?
A) ueasier uto uapply uthan uthin ufilm
B) uinitial ucost uis utypically uless uthan uthin ufilm
C) uProvides ugreater uresistance uto umoisture uingress upermeation
D) uGenerally umore uaccurate uMFL ufloor uscans u- ucorrect uanswer.C
The upurpose uof ureviewing uthe uwelder uperformance uqualification u(WPQ) uis uto:
,A) uVerify uthat uwelder uare uqualified uto uperform uthe uwelding ugiven uits uposition uand
uprocess
B) uVerify uthat uwelds umade uin ucompliance uwith uthe uWPS umeet urequirements
C) uVerify uthat uthe uwelding uprocedure uspecification ucan uproduce uquality uwelds
D) uVerify uthat uwelders uare uqualified uto uperform uthe uwelding, uincluding uall uessential uand
unonessential uvariables u- ucorrect uanswer.A
The urecommended utype uof uinternal ufloating uroof uis uthe:
A) uDouble uDeck
B) uAnnular upontoon
C) uPan utype
D) uSingle usteel udeck u- ucorrect uanswer.B
API uPublication u2201 uon uhot utapping uand uin-service uwelding ucovers:
A) uWelding urequirements
B) utechnical uaspects
C) uInspection urequirements
D) uSafety uaspects u- ucorrect uanswer.D
A urepair uis ucompleted uon ua unozzle uthat uwas uoriginally upostweld uheat utreated(PWHT). uIt
uhas ubeen udetermined uthat uPWHT, uof uthe urepair, uis uinadvisable. uWho uis urequired uto
uconduct ua umetallurgical ureview uprior uto uapplying uone uof uthe ualternative umethods
upermitted uin uAPI u653?
A) uA uprofessional uengineer uregistered uin uone uor umore ustates uor uprovinces uof uCanada
B) uA uStorage utank uengineer
C) uThe uAuthorized uinspector uresponsible ufor uthe urepair uinspection
D) uA uMetallurgical uengineer uexperienced uin ualternative uPWHT u- ucorrect uanswer.B
What uis uanother uterm uused ufor u"Stray ucurrents"?
A) uShort ucircuits
B) uPositive ucurrents
C) uImpressed uCurrents
D) uInterface ucurrents u- ucorrect uanswer.D
Thick-film ulinings uare ucommonly ureinforced uwith uwhich uof uthe ufollowing?
A) uSand uand usmall udiameter ugravel
B) uCopper uwire, uStainless usteel uwire, uand ulow ualloy usteel umesh ufabric
C)Chopped uPVC upiping, ucopped uABS uPiping uand uresin ubeads
D) uWoven uglass umat, uchopped uglass ufibers, uand uorganic ufibers u- ucorrect uanswer.D
How uand uto uwhat uextent uare unew uwelds ufor utank ubottom uplates urequired uto ube
uexamined?
A) uNewly uwelded ubottom ujoints ushall ube utested utheir uentire ulength uusing uliquid upenetrate
B) uNewly uwelded ubottom ujoints ushall ube utested utheir uentire ulength uusing ua uvacuum ubox
uand ua usolution ufilm, uor ua utracer ugas uand udetector
, C) uNewly uwelded ubottom ujoints ushall ube utested utheir uentire ulength uusing uvisual
uexamination
D)Newly uwelded ubottom ujoints ushall ube utested utheir uentire ulength uusing uwet ufluorescent
umagnetic uparticle uexamination u- ucorrect uanswer.B
According uto uAPI u653, uno uwelding uis upermitted uwhen uthe utemperature uof uthe ubase
umetal uis ubelow uwhat uvalue?
A) uBase umetal utemperature ubelow u-20 uF
B) uBase umetal utemperature ubelow u0 uF
C) uBase umetal utemperature ubelow u20 uF
D) uBase umetal utemperature ubelow u30 uF u- ucorrect uanswer.B
IF uan uAST uis ufabricated uof umaterial uof uunknown utoughness uand umeets uthe uthickness
uand utemperature uexemption ucurve uof uAPI u653, uthe ustorage utank uengineer umust uconcur,
uin uwriting, uwith uthe ualternative uweld umethod uin ulieu uof uPWHT. uWho uis urequired uto
uauthorize uthe ualternative uand uhow umust uthis ube uaccomplished?
A) uThe uowner/operator uin uwriting
B) uThe uOwner/operator uverbally
C) uThe uAuthorized uInspecor uin uwriting
D) uThe uAuthorized uInspector uverbally u- ucorrect uanswer.A
When umust uan uevaluation, uto udetermine uthe usuitability ufor ucontinued uuse, ube
uconducted?
A) uEvaluations ushall ube uconducted uwhen ua utank uinspection ureveals ua uchange uhas
uoccurred ufrom uthe uoriginal uphysical ucondition uof ua utank.
B) uEvaluations ushall ube uconducted uat uleast uannually
C) uEvaluations ushall ube uconducted uat uan uinterval unot uto uexceed uthe ucalculated utank
uinspection ufrequency
D) uEvaluations ushall ube uconducted uonce ueach uten uyears uof uservice u- ucorrect uanswer.A
Inspection uHold upoints uand uminimum udocumentation uto ube usubmitted uupon ujob
ucompletion ufor urepairs uand ualterations uwill ube udesignated uby uthe:
A) uOwner/User's uengineering udepartment
B) uRepair uorganization
C) uauthorized uinspector
D) uStorage utank uinspector u- ucorrect uanswer.C
In ua uSMAW uelectrode, uthe u"1" urefers uto:
A) uElectrode utype
B) uCoating ucharacteristics
C) uChemical ucomposition
D) uWelding uposition u- ucorrect uanswer.D
NDE uis udefined uas uthose uinspection umethods uwhich uallow umaterials uto ube uexamined:
A) uwithout udamaging uthe ucomponent
B) uAs uan uadjunct uto uvisual uexamination