100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
BOMI The Design, Operation, and Maintenance of Building Systems, Part I (Solution) Updated Fall 2024/2025. $10.99   Add to cart

Exam (elaborations)

BOMI The Design, Operation, and Maintenance of Building Systems, Part I (Solution) Updated Fall 2024/2025.

 2 views  0 purchase
  • Course
  • Institution

BOMI The Design, Operation, and Maintenance of Building Systems, Part I (Solution) Updated Fall 2024/2025.

Preview 2 out of 7  pages

  • August 21, 2024
  • 7
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
avatar-seller
BOMI The Design, Operation, and
Maintenance of Building Systems, Part I
(Solution) Updated Fall 2024/2025.
Restoration of property to satisfactory conditions without changing the plan, form, or style of a structure

Rehabilitation

Bringing a property into conformity with changes in style, whether interior or exterior

Modernization

To change the plan, form, or style of a structure to correct functional or economical deficiencies

Remodeling

Temporary changes to the plan, form, or style of a structure

Alterations

Architectural firm is hired and serves as the owners agent. Their primary responsibility is providing and
managing the design and construction documents for the project; traditional method.

Design-Bid-Build

Uses separate contracts for the design and construction phase of the project. May be architect-led,
contractor-led, integrated-led, or proprietary; unlike traditional methods.

Design-Build

When the owner contracts separately with a designer and a contractor, and is often chosen in straight
forward projects where the owners wants strong control, but operates with minimal staff; similar to
design-bid-build.

Construction Management-at-Risk (CMAR)

When an owner divides a project into two or more parts and then enters into a separate contract for
each part. Often used for large, complex construction projects that require phases and multiple bid
packages.

Multiple Prime Contracts

Provides information during a bid that adds, deletes, or clarifies information in contract documents

Addenda

Usually between an owner and contractor, design professional, or construction manager. Contractor is
reimbursed for their direct and indirect costs and is paid a fee for their service.

Cost-plus Contract

, The construction manager guarantees, in addition to providing administrative construction management
services, a ceiling price to the owner for the cost of construction.

Guaranteed Maximum Price-Construction Management (GMP-CM)

Between the owner and contractor wherein the owner agrees to pay the contractor a specified sum of
money for completing a project consisting of a variety of specified items of work. Results in low
construction costs with minimal change orders.

Lump Sum Contract

Set contract amount for all labour, materials, equipment, and services and contractors overhead and
profit for all work being performed for a specific project. Includes fixed prices for services, materials,
labour, and local costs reimbursable.

Unit Price Contract

What are the biggest causes of project failure?

Poor estimating and scheduling

What is the most common used project schedule?

Critical Path Method (CPM) Scheduling

Owner/agent orders a change in the project

Actual change

A change in a project is a made due to errors/emissions

Constructive change

An owner disrupts work in a project

Disruptive change

Lime cement that sets by combining water

Hydraulic

Lime cement that hardens by drying out

Nonhydraulic

Lime cement that mainly needs to dry out, but has some hydraulic properties

Semihydraulic

High-compressions strength mortar

Type M

Compression and tensile strength mortar

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller ACADEMICAIDSTORE. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76667 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99
  • (0)
  Add to cart